
Last Updated: Mon Apr 09 20:37:06 BST 2007
All | 1991 | 1992 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | Total
| 1992 | ||||
| 14th March 1992 | Tryfan, Snowdonia, Wales | |||
| Milestone Buttress Direct | 250ft | VD [3] | second, lead: MB, second: MS | |
| A cold and wet day. My first experience with the hot aches at the first stance. | ||||
| 7th May 1992 | Toscaig Avenger, Applecross, Scotland | |||
| Gunge Tank [traverse] | 100ft? | ? | solo [3 x] | |
| 23rd May 1992 | Craig Dhu, Llanberis Pass, Snowdonia, Wales | |||
| Rib and Slab | 250ft | VD (-,-) | alt lead: MB, second: DR | |
| My first lead. | ||||
| Short Tree Chimney [var] | 160ft | S/HS (?,?) | alt lead: MB, second: DR | |
| 13th June 1992 | Bochlwyd Buttress, Snowdonia, Wales | |||
| Two Pitch Route | 100ft | S | second, lead: MB | |
| Arête and Slab | 110ft | D | lead, second: ... | |
| Marble Slab | 60ft | S | second, lead: MB | |
| 5 Pitch Route | 110ft | S | second, lead: MB | |
| 13th June 1992 | Blast Shelter Quarry, Dinorwic, North Wales | |||
| Biggles Flies Undone | 60ft | E1 (5b) | top rope [x 2] | |
| Done at dusk after several beers. | ||||
| 14th June 1992 | Tryfan, Snowdonia, Wales | |||
| Grooved Arête | 500ft | HVD [8] | alt lead: LS | |
| Frog lead Mike and Sean as a rope of three, we spent eight hours on the climb. | ||||
| 21st June 1992 | Goblin Combe, Avon | |||
| 4 routes, top roped, 40ft - 60ft, VD - HS. | ||||
| 28th June 1992 | Goblin Combe, Avon | |||
| 5 routes, top roped, 40ft - 60ft, VD - VS. | ||||
| 14th July 1992 | Sea Walls, Avon Gorge, Bristol | |||
| Sleepwalk | 210ft | S (4a,-,-,4a) | lead, second: SF? | |
| My first lead on my own rack. | ||||
| 15th July 1992 | The Amphitheatre, Avon Gorge, Bristol | |||
| Stranded | 120ft | S (-,-) | lead, second: MP | |
| Liverbird Buttress | 170ft | S (-,-) | lead, second: MP | |
| 18th July 1992 | Goblin Combe, Avon | |||
| All leads were ascended top roped to remove anchors. | ||||
| Bard the Bowman | 50ft | S (4a) | lead, second: MP? | |
| Bolg | 40ft | S (4a) | lead, second: MP? | |
| Gondolin | 70ft | VS (4b) | lead, second: SF | |
| My first VS lead. Slipped and weighted a hex on the crack. Mike couldn't follow. | ||||
| Esgaroth | 50ft | HS (4b) | lead, second: ? | |
| Saruman | 60ft | S (4a) | lead, second: ? | |
| Gandalf | 60ft | VS (4c) | top rope | |
| 21st July 1992 | Sea Walls, Avon Gorge, Bristol | |||
| Nightmare | 160ft | S (-,4a,-) | lead, second: MP, SF | |
| 24th July 1992 | Churchill Rocks, Avon | |||
| Dilemma Zig Zag | 110ft | S (-) | lead, second: SF | |
| Tyro's Crack | 110ft | D (-) | lead, second: SF | |
| Tyro's Crack | 110ft | D (-) | second, lead: SF | |
| Sean's first lead. | ||||
| Witching Waves | 110ft | HS (4a) | lead, second: SF | |
| The Right-Hand Slab | 80ft | D | solo | |
| 26th July 1992 | Goblin Combe, Avon | |||
| Bolg | 40ft | S (4a) | second, lead: LS | |
| Dain | 50ft | S (-) | lead, unseconded | |
| The route collapsed while I was half way up, disloging a large block. I continued and abseiled from a tree. | ||||
| The Gnome King | 60ft | HS (4b) | lead, second: ? | |
| Esgaroth | 50ft | HS (4b) | lead, second: ? | |
| 29th July 1992 | Sea Walls, Avon Gorge, Bristol | |||
| Morpheus [var] | 240ft | VD[+] (4a,-,4c) | var lead: SF | |
| I led the first pitch. Sean took a direct line for the final pitch - finishing unprotected up a steep wall. | ||||
| 4th August 1992 | Braedownie Quarry, Glen Clova, Scotland | |||
| Route 1 | 40ft | D? (-) | lead, second: DR | |
| Direct Finish to Route 1 | 15ft | HS? (-) | top rope | |
| Route 2 | 50ft | HS? (-) | lead, unseconded | |
| Later looked up in the crag guide - "This loose and dangerous quarry gives two routes - one at E4 and the other at E5". | ||||
| 10th August 1992 | Goblin Combe, Avon | |||
| The Hobbit | 50ft | VD (-) | lead, second: MS | |
| Esgaroth | 50ft | HS (4b) | lead, second: MS | |
| Necromancer | 70ft | HS (4b) | lead, second: MS | |
| 14th August 1992 | Sea Walls, Avon Gorge, Bristol | |||
| Nightmare | 160ft | S (4a,-) | lead, second: MS | |
| Morpheus | 240ft | VD (4a,-,-) | lead, second: MS | |
| 15th August 1992 | The Dewerstone, Devon | |||
| Pinnacle Buttress | 120ft | D (-,-) | lead, second: MS | |
| Mucky Gully | 110ft | D (-,-) | second, lead: MS | |
| Mark's first lead. | ||||
| Colonel's Arête | 130ft | HVD (-,-) | lead, second: MS | |
| Needle Buttress: Needle Arête | 120ft | VD (-,-) | lead, second: MS | |
| Raven Buttress: Fly on the Wall | 100ft | HS (4b,4a) | lead, second: MS | |
| 16th August 1992 | Haytor, Dartmoor, Devon | |||
| Vandal and Ann | 80ft | HVS (5b,5a) | lead, second: MS | |
| Lead in mistake for ... | ||||
| Superdirect | 80ft | S (-) | lead,second: MS | |
| No protection. | ||||
| Bridle Piton Slab | 40ft | D (-) | lead, second: MS | |
| No protection, lead as a start to North Face Chimney HS (4b) which I fell ~25ft and retreated on... | ||||
| Raven Gully | 100ft | S (4a,-) | lead, second: MS | |
| 16th August 1992 | Chudleigh Rocks, Devon | |||
| Leek | 60ft | HS (4b,-) | alt lead: MS | |
| Ashtree Buttress | 50ft | VD (-) | lead, second: MS | |
| 28th August 1992 | The Wind Tower, Eldorado Canyon, Boulder, CO, USA | |||
| Breezy | ~100ft | 5.4 (-) | lead, second: SL | |
| 29th August 1992 | The Whale's Tail, Eldorado Canyon, Boulder, CO, USA | |||
| West Dihedral | ~75ft | 5.4 (-) | lead, second: SL | |
| 7th September 1992 | Churchill Rocks, Avon | |||
| Tyro's Crack | 110ft | D (-) | lead, second: ? | |
| The Right-Hand Slab | 80ft | D | solo | |
| 8th September 1992 | Portishead Quarry, Avon | |||
| Pharos | 90ft | S (4a) | lead, second: ? | |
| The Baldest | 90ft | E1 (5b) | var lead: MB | |
| Frog lead part of Retina Plexus - I followed and finished directly up The Baldest placing no protection. | ||||
| 10th September 1992 | Portishead Quarry, Avon | |||
| Pickpocket | 150ft | HVS (5a) | second, lead: MB | |
| The Baldest | 90ft | E1 (5b) | lead, second: MB? | |
| The Brink Of Solarity | 150ft | HVS (4c) | lead, second: ? | |
| 12th September 1992 | Needle Buttress, The Dewerstone, Devon | |||
| Portal | 120ft | S (-,-,4b) | lead, second: MS, WW | |
| I slipped on slime and fell on first pitch, taking a nasty blow to the helmet. | ||||
| 12th September 1992 | Raven Buttress, The Dewerstone, Devon | |||
| Raven Face | 65ft | VD (-) | second, lead: MS, second: WW | |
| 12th September 1992 | Sheepstor, Dartmoor, Devon | |||
| Omega Crack | 30ft | VD (-) | lead, second: MS | |
| Burdock | 30ft | HS (4a) | top rope | |
| Slanting Crack | 30ft | S | top rope | |
| Mushroom Wall | 30ft | VS (4c) | top rope | |
| 13th September 1992 | Chudleigh Rocks, Devon | |||
| Barn Owl Crack | 65ft | HVD (-,-) | var lead: LS | |
| Liz backed down before the crack. I lead it but was completely gripped for the entire route. | ||||
| 17th September 1992 | Sea Walls, Avon Gorge, Bristol | |||
| Morpheus | 240ft | VD (4a,-,-) | second, lead: MS | |
| 20th September 1992 | Symonds Yat, Wye Valley | |||
| Snoozin' Suzie | 130ft | VD (-) | lead, second: SL2 | |
| Golden Fleece | 80ft | S (4a) | second, lead: LS | |
| 10th October 1992 | Cwm Silyn, Snowdonia, Wales | |||
| Outside Edge | 400ft | HVD (-,-,-) | lead, second: WW | |
| 11th October 1992 | Idwal Slabs, Snowdonia, Wales | |||
| Faith | 440ft | VD (-,-,-,-) | alt lead: MS, second: WW | |
| 13th October 1992 | Portishead Quarry, Avon | |||
| The Brink Of Solarity | 150ft | HVS (4c) | second, lead: MS | |
| 18th October 1992 | Portishead Quarry, Avon | |||
| Pharos | 90ft | S (4a) | lead, second: DR | |
| Total Number of Routes | 84 |
| Total Length (m) | 2,702 |
| Total Length (ft) | 8,860 |
| Partner | Name | # Routes | Total Length | ||
|---|---|---|---|---|---|
| 1. | MS | Mark Syrett | 23 | 870 m | 2,855 ft |
| 2. | MB | Mark Bailey | 9 | 384 m | 1,260 ft |
| 3. | SF | Sean Franks | 8 | 341 m | 1,120 ft |
| 4. | WW | Will Wray | 4 | 312 m | 1,025 ft |
| 5. | LS | Liz Stanley | 4 | 208 m | 685 ft |
| 6. | MP | Mike Powell | 5 | 164 m | 540 ft |
| 7. | DR | Dave Randell | 4 | 164 m | 540 ft |
| 8. | SL | Simon Love | 2 | 53 m | 175 ft |
| 9. | SL2 | Steve Loughran | 1 | 39 m | 130 ft |
All information on this site is copyright © 1994-2016 Jim Randell