Last Updated: Mon Apr 09 20:37:06 BST 2007
All | 1991 | 1992 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | Total
1992 | ||||
14th March 1992 | Tryfan, Snowdonia, Wales | |||
Milestone Buttress Direct | 250ft | VD [3] | second, lead: MB, second: MS | |
A cold and wet day. My first experience with the hot aches at the first stance. | ||||
7th May 1992 | Toscaig Avenger, Applecross, Scotland | |||
Gunge Tank [traverse] | 100ft? | ? | solo [3 x] | |
23rd May 1992 | Craig Dhu, Llanberis Pass, Snowdonia, Wales | |||
Rib and Slab | 250ft | VD (-,-) | alt lead: MB, second: DR | |
My first lead. | ||||
Short Tree Chimney [var] | 160ft | S/HS (?,?) | alt lead: MB, second: DR | |
13th June 1992 | Bochlwyd Buttress, Snowdonia, Wales | |||
Two Pitch Route | 100ft | S | second, lead: MB | |
Arête and Slab | 110ft | D | lead, second: ... | |
Marble Slab | 60ft | S | second, lead: MB | |
5 Pitch Route | 110ft | S | second, lead: MB | |
13th June 1992 | Blast Shelter Quarry, Dinorwic, North Wales | |||
Biggles Flies Undone | 60ft | E1 (5b) | top rope [x 2] | |
Done at dusk after several beers. | ||||
14th June 1992 | Tryfan, Snowdonia, Wales | |||
Grooved Arête | 500ft | HVD [8] | alt lead: LS | |
Frog lead Mike and Sean as a rope of three, we spent eight hours on the climb. | ||||
21st June 1992 | Goblin Combe, Avon | |||
4 routes, top roped, 40ft - 60ft, VD - HS. | ||||
28th June 1992 | Goblin Combe, Avon | |||
5 routes, top roped, 40ft - 60ft, VD - VS. | ||||
14th July 1992 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk | 210ft | S (4a,-,-,4a) | lead, second: SF? | |
My first lead on my own rack. | ||||
15th July 1992 | The Amphitheatre, Avon Gorge, Bristol | |||
Stranded | 120ft | S (-,-) | lead, second: MP | |
Liverbird Buttress | 170ft | S (-,-) | lead, second: MP | |
18th July 1992 | Goblin Combe, Avon | |||
All leads were ascended top roped to remove anchors. | ||||
Bard the Bowman | 50ft | S (4a) | lead, second: MP? | |
Bolg | 40ft | S (4a) | lead, second: MP? | |
Gondolin | 70ft | VS (4b) | lead, second: SF | |
My first VS lead. Slipped and weighted a hex on the crack. Mike couldn't follow. | ||||
Esgaroth | 50ft | HS (4b) | lead, second: ? | |
Saruman | 60ft | S (4a) | lead, second: ? | |
Gandalf | 60ft | VS (4c) | top rope | |
21st July 1992 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare | 160ft | S (-,4a,-) | lead, second: MP, SF | |
24th July 1992 | Churchill Rocks, Avon | |||
Dilemma Zig Zag | 110ft | S (-) | lead, second: SF | |
Tyro's Crack | 110ft | D (-) | lead, second: SF | |
Tyro's Crack | 110ft | D (-) | second, lead: SF | |
Sean's first lead. | ||||
Witching Waves | 110ft | HS (4a) | lead, second: SF | |
The Right-Hand Slab | 80ft | D | solo | |
26th July 1992 | Goblin Combe, Avon | |||
Bolg | 40ft | S (4a) | second, lead: LS | |
Dain | 50ft | S (-) | lead, unseconded | |
The route collapsed while I was half way up, disloging a large block. I continued and abseiled from a tree. | ||||
The Gnome King | 60ft | HS (4b) | lead, second: ? | |
Esgaroth | 50ft | HS (4b) | lead, second: ? | |
29th July 1992 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus [var] | 240ft | VD[+] (4a,-,4c) | var lead: SF | |
I led the first pitch. Sean took a direct line for the final pitch - finishing unprotected up a steep wall. | ||||
4th August 1992 | Braedownie Quarry, Glen Clova, Scotland | |||
Route 1 | 40ft | D? (-) | lead, second: DR | |
Direct Finish to Route 1 | 15ft | HS? (-) | top rope | |
Route 2 | 50ft | HS? (-) | lead, unseconded | |
Later looked up in the crag guide - "This loose and dangerous quarry gives two routes - one at E4 and the other at E5". | ||||
10th August 1992 | Goblin Combe, Avon | |||
The Hobbit | 50ft | VD (-) | lead, second: MS | |
Esgaroth | 50ft | HS (4b) | lead, second: MS | |
Necromancer | 70ft | HS (4b) | lead, second: MS | |
14th August 1992 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare | 160ft | S (4a,-) | lead, second: MS | |
Morpheus | 240ft | VD (4a,-,-) | lead, second: MS | |
15th August 1992 | The Dewerstone, Devon | |||
Pinnacle Buttress | 120ft | D (-,-) | lead, second: MS | |
Mucky Gully | 110ft | D (-,-) | second, lead: MS | |
Mark's first lead. | ||||
Colonel's Arête | 130ft | HVD (-,-) | lead, second: MS | |
Needle Buttress: Needle Arête | 120ft | VD (-,-) | lead, second: MS | |
Raven Buttress: Fly on the Wall | 100ft | HS (4b,4a) | lead, second: MS | |
16th August 1992 | Haytor, Dartmoor, Devon | |||
Vandal and Ann | 80ft | HVS (5b,5a) | lead, second: MS | |
Lead in mistake for ... | ||||
Superdirect | 80ft | S (-) | lead,second: MS | |
No protection. | ||||
Bridle Piton Slab | 40ft | D (-) | lead, second: MS | |
No protection, lead as a start to North Face Chimney HS (4b) which I fell ~25ft and retreated on... | ||||
Raven Gully | 100ft | S (4a,-) | lead, second: MS | |
16th August 1992 | Chudleigh Rocks, Devon | |||
Leek | 60ft | HS (4b,-) | alt lead: MS | |
Ashtree Buttress | 50ft | VD (-) | lead, second: MS | |
28th August 1992 | The Wind Tower, Eldorado Canyon, Boulder, CO, USA | |||
Breezy | ~100ft | 5.4 (-) | lead, second: SL | |
29th August 1992 | The Whale's Tail, Eldorado Canyon, Boulder, CO, USA | |||
West Dihedral | ~75ft | 5.4 (-) | lead, second: SL | |
7th September 1992 | Churchill Rocks, Avon | |||
Tyro's Crack | 110ft | D (-) | lead, second: ? | |
The Right-Hand Slab | 80ft | D | solo | |
8th September 1992 | Portishead Quarry, Avon | |||
Pharos | 90ft | S (4a) | lead, second: ? | |
The Baldest | 90ft | E1 (5b) | var lead: MB | |
Frog lead part of Retina Plexus - I followed and finished directly up The Baldest placing no protection. | ||||
10th September 1992 | Portishead Quarry, Avon | |||
Pickpocket | 150ft | HVS (5a) | second, lead: MB | |
The Baldest | 90ft | E1 (5b) | lead, second: MB? | |
The Brink Of Solarity | 150ft | HVS (4c) | lead, second: ? | |
12th September 1992 | Needle Buttress, The Dewerstone, Devon | |||
Portal | 120ft | S (-,-,4b) | lead, second: MS, WW | |
I slipped on slime and fell on first pitch, taking a nasty blow to the helmet. | ||||
12th September 1992 | Raven Buttress, The Dewerstone, Devon | |||
Raven Face | 65ft | VD (-) | second, lead: MS, second: WW | |
12th September 1992 | Sheepstor, Dartmoor, Devon | |||
Omega Crack | 30ft | VD (-) | lead, second: MS | |
Burdock | 30ft | HS (4a) | top rope | |
Slanting Crack | 30ft | S | top rope | |
Mushroom Wall | 30ft | VS (4c) | top rope | |
13th September 1992 | Chudleigh Rocks, Devon | |||
Barn Owl Crack | 65ft | HVD (-,-) | var lead: LS | |
Liz backed down before the crack. I lead it but was completely gripped for the entire route. | ||||
17th September 1992 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus | 240ft | VD (4a,-,-) | second, lead: MS | |
20th September 1992 | Symonds Yat, Wye Valley | |||
Snoozin' Suzie | 130ft | VD (-) | lead, second: SL2 | |
Golden Fleece | 80ft | S (4a) | second, lead: LS | |
10th October 1992 | Cwm Silyn, Snowdonia, Wales | |||
Outside Edge | 400ft | HVD (-,-,-) | lead, second: WW | |
11th October 1992 | Idwal Slabs, Snowdonia, Wales | |||
Faith | 440ft | VD (-,-,-,-) | alt lead: MS, second: WW | |
13th October 1992 | Portishead Quarry, Avon | |||
The Brink Of Solarity | 150ft | HVS (4c) | second, lead: MS | |
18th October 1992 | Portishead Quarry, Avon | |||
Pharos | 90ft | S (4a) | lead, second: DR | |
Total Number of Routes | 84 |
Total Length (m) | 2,702 |
Total Length (ft) | 8,860 |
Partner | Name | # Routes | Total Length | ||
---|---|---|---|---|---|
1. | MS | Mark Syrett | 23 | 870 m | 2,855 ft |
2. | MB | Mark Bailey | 9 | 384 m | 1,260 ft |
3. | SF | Sean Franks | 8 | 341 m | 1,120 ft |
4. | WW | Will Wray | 4 | 312 m | 1,025 ft |
5. | LS | Liz Stanley | 4 | 208 m | 685 ft |
6. | MP | Mike Powell | 5 | 164 m | 540 ft |
7. | DR | Dave Randell | 4 | 164 m | 540 ft |
8. | SL | Simon Love | 2 | 53 m | 175 ft |
9. | SL2 | Steve Loughran | 1 | 39 m | 130 ft |
All information on this site is copyright © 1994-2016 Jim Randell