Jim's Site
 Home 
 Climbing & Walking 
 >Climbing Logs 
   Mountain Lists 
   Trip Reports 
 Macaroni Penguins 
 Photo Gallery 
 Miscellaneous 

Jim's Climbs - 1992

Last Updated: Mon Apr 09 20:37:06 BST 2007



All | 1991 | 1992 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | Total

1992
14th March 1992 Tryfan, Snowdonia, Wales
Milestone Buttress Direct 250ft VD [3] second, lead: MB, second: MS
A cold and wet day. My first experience with the hot aches at the first stance.

7th May 1992 Toscaig Avenger, Applecross, Scotland
Gunge Tank [traverse] 100ft? ? solo [3 x]

23rd May 1992 Craig Dhu, Llanberis Pass, Snowdonia, Wales
Rib and Slab 250ft VD (-,-) alt lead: MB, second: DR
My first lead.
Short Tree Chimney [var] 160ft S/HS (?,?) alt lead: MB, second: DR

13th June 1992 Bochlwyd Buttress, Snowdonia, Wales
Two Pitch Route 100ft S second, lead: MB
Arête and Slab 110ft D lead, second: ...
Marble Slab 60ft S second, lead: MB
5 Pitch Route 110ft S second, lead: MB

13th June 1992 Blast Shelter Quarry, Dinorwic, North Wales
Biggles Flies Undone 60ft E1 (5b) top rope [x 2]
Done at dusk after several beers.

14th June 1992 Tryfan, Snowdonia, Wales
Grooved Arête 500ft HVD [8] alt lead: LS
Frog lead Mike and Sean as a rope of three, we spent eight hours on the climb.

21st June 1992 Goblin Combe, Avon
4 routes, top roped, 40ft - 60ft, VD - HS.

28th June 1992 Goblin Combe, Avon
5 routes, top roped, 40ft - 60ft, VD - VS.

14th July 1992 Sea Walls, Avon Gorge, Bristol
Sleepwalk 210ft S (4a,-,-,4a) lead, second: SF?
My first lead on my own rack.

15th July 1992 The Amphitheatre, Avon Gorge, Bristol
Stranded 120ft S (-,-) lead, second: MP
Liverbird Buttress 170ft S (-,-) lead, second: MP

18th July 1992 Goblin Combe, Avon
All leads were ascended top roped to remove anchors.
Bard the Bowman 50ft S (4a) lead, second: MP?
Bolg 40ft S (4a) lead, second: MP?
Gondolin 70ft VS (4b) lead, second: SF
My first VS lead. Slipped and weighted a hex on the crack. Mike couldn't follow.
Esgaroth 50ft HS (4b) lead, second: ?
Saruman 60ft S (4a) lead, second: ?
Gandalf 60ft VS (4c) top rope

21st July 1992 Sea Walls, Avon Gorge, Bristol
Nightmare 160ft S (-,4a,-) lead, second: MP, SF

24th July 1992 Churchill Rocks, Avon
Dilemma Zig Zag 110ft S (-) lead, second: SF
Tyro's Crack 110ft D (-) lead, second: SF
Tyro's Crack 110ft D (-) second, lead: SF
Sean's first lead.
Witching Waves 110ft HS (4a) lead, second: SF
The Right-Hand Slab 80ft D solo

26th July 1992 Goblin Combe, Avon
Bolg 40ft S (4a) second, lead: LS
Dain 50ft S (-) lead, unseconded
The route collapsed while I was half way up, disloging a large block. I continued and abseiled from a tree.
The Gnome King 60ft HS (4b) lead, second: ?
Esgaroth 50ft HS (4b) lead, second: ?

29th July 1992 Sea Walls, Avon Gorge, Bristol
Morpheus [var] 240ft VD[+] (4a,-,4c) var lead: SF
I led the first pitch. Sean took a direct line for the final pitch - finishing unprotected up a steep wall.

4th August 1992 Braedownie Quarry, Glen Clova, Scotland
Route 1 40ft D? (-) lead, second: DR
Direct Finish to Route 1 15ft HS? (-) top rope
Route 2 50ft HS? (-) lead, unseconded
Later looked up in the crag guide - "This loose and dangerous quarry gives two routes - one at E4 and the other at E5".

10th August 1992 Goblin Combe, Avon
The Hobbit 50ft VD (-) lead, second: MS
Esgaroth 50ft HS (4b) lead, second: MS
Necromancer 70ft HS (4b) lead, second: MS

14th August 1992 Sea Walls, Avon Gorge, Bristol
Nightmare 160ft S (4a,-) lead, second: MS
Morpheus 240ft VD (4a,-,-) lead, second: MS

15th August 1992 The Dewerstone, Devon
Pinnacle Buttress 120ft D (-,-) lead, second: MS
Mucky Gully 110ft D (-,-) second, lead: MS
Mark's first lead.
Colonel's Arête 130ft HVD (-,-) lead, second: MS
Needle Buttress: Needle Arête 120ft VD (-,-) lead, second: MS
Raven Buttress: Fly on the Wall 100ft HS (4b,4a) lead, second: MS

16th August 1992 Haytor, Dartmoor, Devon
Vandal and Ann 80ft HVS (5b,5a) lead, second: MS
Lead in mistake for ...
Superdirect 80ft S (-) lead,second: MS
No protection.
Bridle Piton Slab 40ft D (-) lead, second: MS
No protection, lead as a start to North Face Chimney HS (4b) which I fell ~25ft and retreated on...
Raven Gully 100ft S (4a,-) lead, second: MS

16th August 1992 Chudleigh Rocks, Devon
Leek 60ft HS (4b,-) alt lead: MS
Ashtree Buttress 50ft VD (-) lead, second: MS

28th August 1992 The Wind Tower, Eldorado Canyon, Boulder, CO, USA
Breezy ~100ft 5.4 (-) lead, second: SL

29th August 1992 The Whale's Tail, Eldorado Canyon, Boulder, CO, USA
West Dihedral ~75ft 5.4 (-) lead, second: SL

7th September 1992 Churchill Rocks, Avon
Tyro's Crack 110ft D (-) lead, second: ?
The Right-Hand Slab 80ft D solo

8th September 1992 Portishead Quarry, Avon
Pharos 90ft S (4a) lead, second: ?
The Baldest 90ft E1 (5b) var lead: MB
Frog lead part of Retina Plexus - I followed and finished directly up The Baldest placing no protection.

10th September 1992 Portishead Quarry, Avon
Pickpocket 150ft HVS (5a) second, lead: MB
The Baldest 90ft E1 (5b) lead, second: MB?
The Brink Of Solarity 150ft HVS (4c) lead, second: ?

12th September 1992 Needle Buttress, The Dewerstone, Devon
Portal 120ft S (-,-,4b) lead, second: MS, WW
I slipped on slime and fell on first pitch, taking a nasty blow to the helmet.

12th September 1992 Raven Buttress, The Dewerstone, Devon
Raven Face 65ft VD (-) second, lead: MS, second: WW

12th September 1992 Sheepstor, Dartmoor, Devon
Omega Crack 30ft VD (-) lead, second: MS
Burdock 30ft HS (4a) top rope
Slanting Crack 30ft S top rope
Mushroom Wall 30ft VS (4c) top rope

13th September 1992 Chudleigh Rocks, Devon
Barn Owl Crack 65ft HVD (-,-) var lead: LS
Liz backed down before the crack. I lead it but was completely gripped for the entire route.

17th September 1992 Sea Walls, Avon Gorge, Bristol
Morpheus 240ft VD (4a,-,-) second, lead: MS

20th September 1992 Symonds Yat, Wye Valley
Snoozin' Suzie 130ft VD (-) lead, second: SL2
Golden Fleece 80ft S (4a) second, lead: LS

10th October 1992 Cwm Silyn, Snowdonia, Wales
Outside Edge 400ft HVD (-,-,-) lead, second: WW

11th October 1992 Idwal Slabs, Snowdonia, Wales
Faith 440ft VD (-,-,-,-) alt lead: MS, second: WW

13th October 1992 Portishead Quarry, Avon
The Brink Of Solarity 150ft HVS (4c) second, lead: MS

18th October 1992 Portishead Quarry, Avon
Pharos 90ft S (4a) lead, second: DR

Total Number of Routes  84
Total Length (m) 2,702
Total Length (ft) 8,860

The Partners


Partner Name # Routes Total Length
1. MS  Mark Syrett 23 870 m 2,855 ft
2. MB  Mark Bailey 9 384 m 1,260 ft
3. SF  Sean Franks 8 341 m 1,120 ft
4. WW  Will Wray 4 312 m 1,025 ft
5. LS  Liz Stanley 4 208 m 685 ft
6. MP  Mike Powell 5 164 m 540 ft
7. DR  Dave Randell 4 164 m 540 ft
8. SL  Simon Love 2 53 m 175 ft
9. SL2  Steve Loughran 1 39 m 130 ft


All information on this site is copyright © 1994-2016 Jim Randell