Last Updated: Sun Jul 06 22:15:07 BST 2008
All [ 1991 | 1992 | 1993 | 1994 | 1995 | 1996 | 1997 | 1998 | 1999 | 2000 | 2001 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 ] Total
1991 | ||||
20th August 1991 | Portishead Quarry, Avon | |||
Pharos | 90ft | S (4a) | top rope, lead: SL | |
14th September 1991 | Upper Tier, Tremadog, North Wales | |||
Plas-y-Brenin climbing course. | ||||
? | 70ft | ? | top rope | |
? | 70ft | ? | top rope | |
15th September 1991 | Idwal Slabs, Snowdonia, Wales | |||
Plas-y-Brenin climbing course. | ||||
Charity | 470ft | VD [3?] | second, lead: ES, second: WW | |
Tennis Shoe [pitches 1 & 2] | 145ft | VD [2] | second, lead: ES, second: WW | |
17th November 1991 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk | 210ft | S (4a,-,-,4a) | second, lead: MB, second: LS | |
Mistaken for Morpheus. Frog copied the route description out of South West Climbs in a book shop. I had to belay Liz in the middle of a pitch as we ran out of rope. | ||||
1st December 1991 | Sea Walls, Avon Gorge, Bristol | |||
Idleburger Buttress | 80ft | VD | top rope | |
Idleburger Buttress [var] | 80ft | VD | top rope | |
Syph | 80ft | S | top rope | |
Syph [var] | 80ft | S | top rope | |
30th December 1991 | Cranberry Crags, Cairngorm, Scotland | |||
I wish I'd taken my gloves off | 100ft? | S? | second, lead: HB | |
Goodbye Runner | 50ft? | ? | top rope | |
Impossible Turkey | 30ft? | ? | project | |
1992 | ||||
14th March 1992 | Tryfan, Snowdonia, Wales | |||
Milestone Buttress Direct | 250ft | VD [3] | second, lead: MB, second: MS | |
A cold and wet day. My first experience with the hot aches at the first stance. | ||||
7th May 1992 | Toscaig Avenger, Applecross, Scotland | |||
Gunge Tank [traverse] | 100ft? | ? | solo [3 x] | |
23rd May 1992 | Craig Dhu, Llanberis Pass, Snowdonia, Wales | |||
Rib and Slab | 250ft | VD (-,-) | alt lead: MB, second: DR | |
My first lead. | ||||
Short Tree Chimney [var] | 160ft | S/HS (?,?) | alt lead: MB, second: DR | |
13th June 1992 | Bochlwyd Buttress, Snowdonia, Wales | |||
Two Pitch Route | 100ft | S | second, lead: MB | |
Arête and Slab | 110ft | D | lead, second: ... | |
Marble Slab | 60ft | S | second, lead: MB | |
5 Pitch Route | 110ft | S | second, lead: MB | |
13th June 1992 | Blast Shelter Quarry, Dinorwic, North Wales | |||
Biggles Flies Undone | 60ft | E1 (5b) | top rope [x 2] | |
Done at dusk after several beers. | ||||
14th June 1992 | Tryfan, Snowdonia, Wales | |||
Grooved Arête | 500ft | HVD [8] | alt lead: LS | |
Frog lead Mike and Sean as a rope of three, we spent eight hours on the climb. | ||||
21st June 1992 | Goblin Combe, Avon | |||
4 routes, top roped, 40ft - 60ft, VD - HS. | ||||
28th June 1992 | Goblin Combe, Avon | |||
5 routes, top roped, 40ft - 60ft, VD - VS. | ||||
14th July 1992 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk | 210ft | S (4a,-,-,4a) | lead, second: SF? | |
My first lead on my own rack. | ||||
15th July 1992 | The Amphitheatre, Avon Gorge, Bristol | |||
Stranded | 120ft | S (-,-) | lead, second: MP | |
Liverbird Buttress | 170ft | S (-,-) | lead, second: MP | |
18th July 1992 | Goblin Combe, Avon | |||
All leads were ascended top roped to remove anchors. | ||||
Bard the Bowman | 50ft | S (4a) | lead, second: MP? | |
Bolg | 40ft | S (4a) | lead, second: MP? | |
Gondolin | 70ft | VS (4b) | lead, second: SF | |
My first VS lead. Slipped and weighted a hex on the crack. Mike couldn't follow. | ||||
Esgaroth | 50ft | HS (4b) | lead, second: ? | |
Saruman | 60ft | S (4a) | lead, second: ? | |
Gandalf | 60ft | VS (4c) | top rope | |
21st July 1992 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare | 160ft | S (-,4a,-) | lead, second: MP, SF | |
24th July 1992 | Churchill Rocks, Avon | |||
Dilemma Zig Zag | 110ft | S (-) | lead, second: SF | |
Tyro's Crack | 110ft | D (-) | lead, second: SF | |
Tyro's Crack | 110ft | D (-) | second, lead: SF | |
Sean's first lead. | ||||
Witching Waves | 110ft | HS (4a) | lead, second: SF | |
The Right-Hand Slab | 80ft | D | solo | |
26th July 1992 | Goblin Combe, Avon | |||
Bolg | 40ft | S (4a) | second, lead: LS | |
Dain | 50ft | S (-) | lead, unseconded | |
The route collapsed while I was half way up, disloging a large block. I continued and abseiled from a tree. | ||||
The Gnome King | 60ft | HS (4b) | lead, second: ? | |
Esgaroth | 50ft | HS (4b) | lead, second: ? | |
29th July 1992 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus [var] | 240ft | VD[+] (4a,-,4c) | var lead: SF | |
I led the first pitch. Sean took a direct line for the final pitch - finishing unprotected up a steep wall. | ||||
4th August 1992 | Braedownie Quarry, Glen Clova, Scotland | |||
Route 1 | 40ft | D? (-) | lead, second: DR | |
Direct Finish to Route 1 | 15ft | HS? (-) | top rope | |
Route 2 | 50ft | HS? (-) | lead, unseconded | |
Later looked up in the crag guide - "This loose and dangerous quarry gives two routes - one at E4 and the other at E5". | ||||
10th August 1992 | Goblin Combe, Avon | |||
The Hobbit | 50ft | VD (-) | lead, second: MS | |
Esgaroth | 50ft | HS (4b) | lead, second: MS | |
Necromancer | 70ft | HS (4b) | lead, second: MS | |
14th August 1992 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare | 160ft | S (4a,-) | lead, second: MS | |
Morpheus | 240ft | VD (4a,-,-) | lead, second: MS | |
15th August 1992 | The Dewerstone, Devon | |||
Pinnacle Buttress | 120ft | D (-,-) | lead, second: MS | |
Mucky Gully | 110ft | D (-,-) | second, lead: MS | |
Mark's first lead. | ||||
Colonel's Arête | 130ft | HVD (-,-) | lead, second: MS | |
Needle Buttress: Needle Arête | 120ft | VD (-,-) | lead, second: MS | |
Raven Buttress: Fly on the Wall | 100ft | HS (4b,4a) | lead, second: MS | |
16th August 1992 | Haytor, Dartmoor, Devon | |||
Vandal and Ann | 80ft | HVS (5b,5a) | lead, second: MS | |
Lead in mistake for ... | ||||
Superdirect | 80ft | S (-) | lead,second: MS | |
No protection. | ||||
Bridle Piton Slab | 40ft | D (-) | lead, second: MS | |
No protection, lead as a start to North Face Chimney HS (4b) which I fell ~25ft and retreated on... | ||||
Raven Gully | 100ft | S (4a,-) | lead, second: MS | |
16th August 1992 | Chudleigh Rocks, Devon | |||
Leek | 60ft | HS (4b,-) | alt lead: MS | |
Ashtree Buttress | 50ft | VD (-) | lead, second: MS | |
28th August 1992 | The Wind Tower, Eldorado Canyon, Boulder, CO, USA | |||
Breezy | ~100ft | 5.4 (-) | lead, second: SL | |
29th August 1992 | The Whale's Tail, Eldorado Canyon, Boulder, CO, USA | |||
West Dihedral | ~75ft | 5.4 (-) | lead, second: SL | |
7th September 1992 | Churchill Rocks, Avon | |||
Tyro's Crack | 110ft | D (-) | lead, second: ? | |
The Right-Hand Slab | 80ft | D | solo | |
8th September 1992 | Portishead Quarry, Avon | |||
Pharos | 90ft | S (4a) | lead, second: ? | |
The Baldest | 90ft | E1 (5b) | var lead: MB | |
Frog lead part of Retina Plexus - I followed and finished directly up The Baldest placing no protection. | ||||
10th September 1992 | Portishead Quarry, Avon | |||
Pickpocket | 150ft | HVS (5a) | second, lead: MB | |
The Baldest | 90ft | E1 (5b) | lead, second: MB? | |
The Brink Of Solarity | 150ft | HVS (4c) | lead, second: ? | |
12th September 1992 | Needle Buttress, The Dewerstone, Devon | |||
Portal | 120ft | S (-,-,4b) | lead, second: MS, WW | |
I slipped on slime and fell on first pitch, taking a nasty blow to the helmet. | ||||
12th September 1992 | Raven Buttress, The Dewerstone, Devon | |||
Raven Face | 65ft | VD (-) | second, lead: MS, second: WW | |
12th September 1992 | Sheepstor, Dartmoor, Devon | |||
Omega Crack | 30ft | VD (-) | lead, second: MS | |
Burdock | 30ft | HS (4a) | top rope | |
Slanting Crack | 30ft | S | top rope | |
Mushroom Wall | 30ft | VS (4c) | top rope | |
13th September 1992 | Chudleigh Rocks, Devon | |||
Barn Owl Crack | 65ft | HVD (-,-) | var lead: LS | |
Liz backed down before the crack. I lead it but was completely gripped for the entire route. | ||||
17th September 1992 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus | 240ft | VD (4a,-,-) | second, lead: MS | |
20th September 1992 | Symonds Yat, Wye Valley | |||
Snoozin' Suzie | 130ft | VD (-) | lead, second: SL2 | |
Golden Fleece | 80ft | S (4a) | second, lead: LS | |
10th October 1992 | Cwm Silyn, Snowdonia, Wales | |||
Outside Edge | 400ft | HVD (-,-,-) | lead, second: WW | |
11th October 1992 | Idwal Slabs, Snowdonia, Wales | |||
Faith | 440ft | VD (-,-,-,-) | alt lead: MS, second: WW | |
13th October 1992 | Portishead Quarry, Avon | |||
The Brink Of Solarity | 150ft | HVS (4c) | second, lead: MS | |
18th October 1992 | Portishead Quarry, Avon | |||
Pharos | 90ft | S (4a) | lead, second: DR | |
1993 | ||||
31st January 1993 | Carter Lake Res., CO, USA | |||
Bouldering. Soloed 23 routes (mostly twice). 15 - 25ft. 5.6 - 5.9. | ||||
4th April 1993 | Seal Rock, Boulder, CO, USA | |||
East Face Right | ~500ft | 5.4 [4] | lead, second: PM | |
25th April 1993 | First Flatiron, Boulder, CO, USA | |||
East Face Centre | ~1500ft | 5.5/6 [10] | alt lead: MS | |
26th April 1993 | Fourth Flatiron, Boulder, CO, USA | |||
East Face | ~1500ft | 5.4 [12] | alt lead: MS | |
27th April 1993 | Lumpy Ridge, Estes Park, CO, USA | |||
I forgot my rock boots and climbed in my Hi-Tec boots. | ||||
The Pear: Gina's Surprise | ~100ft | 5.4 (-) | lead, second: MS | |
Lens Rock: Tennis Shoe Tango | ~200ft | 5.6 (-,-) | second, lead: MS | |
2nd May 1993 | Batman Pinnacle, Lumpy Ridge, Estes Park, CO, USA | |||
Batman and Robin [var] | ~400ft | 5.6[+] [4] | lead, second: PM | |
Got off route on the second pitch, ended up on a bald crumbling slab with no protection. | ||||
16th May 1993 | Vedauwoo Rock, WY, USA | |||
Edwards Crack | ~200ft | 5.6 (-,-) | lead, second: PM | |
25th May 1993 | Jetty Crag, Gairloch, Scotland | |||
Doddle [+ Direct Finish] | 100ft | VD (-) | lead, second: DR | |
Bus Stop | 75ft | S (-) | top rope | |
Tick Fever | 75ft | VD (-) | second, lead: MB | |
Get up that rock you metal bastard | 75ft | S (5a/b start) | top rope | |
A direct line between Doddle and Tick Fever, taking the hard start of the former. | ||||
Batty | 80ft | VS (-) | second, lead: MB | |
SW Corner | 80ft | S (-) | lead, second: MB | |
Starwood | 80ft | HVS (5a) | second, lead: MB | |
26th May 1993 | Triple Buttress, Beinn Eighe, Torridon, Scotland | |||
These three routes to give a thousand feet and eight hours of hard climbing: | ||||
Direct Start | 100ft | D (-) | lead, second: MB | |
Slab Route | 90m | D [3] | alt lead: MB | |
![]() |
180m | S[+] [7] | alt lead: MB | |
28th May 1993 | Sgorr Ruadh, Achnashellach, Scotland | |||
Raeburn's Buttress | 300m | D[+] [3+...] | alt lead: MB, second: DR, SD | |
30ft of Difficult climbing turned into three pitches of gripping leading over steep, loose rock. | ||||
31st May 1993 | Shepard's Crag, Borrowdale, Lake District | |||
Brown Arête | 30m | D (-,-) | alt lead: MS | |
2nd June 1993 | Stanage Edge, Peak District | |||
Crack and Corner | 15m | HVD (4b) | lead, second: MS | |
Black Hawk Hell Crack | 14m | S (-) | lead, second: MS | |
Castle Crack | 18m | HS (4a) | lead, second: MS | |
Manchester Buttress | 15m | HS (4b,-) | lead, var second: MS | |
Due to rope drag I had to take a stance on route. Mark walked off from the middle of the route in disgust. | ||||
Sociology | 13m | S (-) | lead, second: MS | |
Grotto Slab | 18m | D | solo | |
3rd June 1993 | Stanage Edge, Peak District | |||
Heather Wall | 12m | VS (4c) | var lead: MS | |
Mark backed down. I completed the route, only finding out later its true grade. | ||||
Flying Buttress | 20m | VD (-) | second, lead: MS | |
Leaning Buttress | 16m | VD (-) | second, lead: MS | |
Hollybush Crack | 14m | VD (-) | second, lead: MS | |
April Crack | 15m | HS (4b) | lead, second: MS | |
Christmas Crack | 15m | HS (4b) | lead, second: MS | |
RHRHB Direct | 23m | HS (-) | lead, second: MS | |
RHRHB = Robin Hood's Right Hand Buttress. | ||||
Inverted V | 21m | VS (4b) | lead, second: MS | |
Robin Hood's Balcony Cave Direct | 12m | VD (-) | second, lead: MS | |
4th June 1993 | Rivelin Edge, Peak District | |||
Oversight | 7m | S (4a) | lead, second: MS | |
Shelf Wall | 6m | VS (4c) | second, lead: MS | |
David's Chimney | 9m | D (-) | second, lead: MS | |
Renshaw's Remedy | 9m | VD (-) | lead, second: MN | |
Regular Route | 9m | HVS (5a) | top rope | |
![]() |
22m | VS (4c) [2] | second, lead: MS, MB, second: LS | |
6th June 1993 | Churchill Rocks, Avon | |||
Tyro's Crack | 110ft | D (-) | lead, second: DR | |
The Right-Hand Slab | 80ft | D | solo | |
26th June 1993 | Greyrock Mtn., CO, USA | |||
? Chimney | ~500ft | 5.4 (-,-,-,-) | alt lead: DJ | |
? | ~75ft | 5.8 | top rope | |
? | ~100ft | 5.6 (-) | lead, second: DJ | |
18th July 1993 | The Back Porch, Boulder, CO, USA | |||
East Face | ~300ft | 5.6 (-,-) | lead, second: PM | |
Due to nesting restrictions on the abseil I had to prussik 75ft and we descended via the route. | ||||
3rd August 1993 | Onoclea, Boulder, CO, USA | |||
East Face | 450ft | 5.3 (-,-,-,-) | lead, second: DR | |
6th August 1993 | Third Flatiron, Boulder, CO, USA | |||
East Face, Standard Route | 950ft | 5.2 [8] | lead, second: DR | |
14th August 1993 | The Fatiron, Boulder, CO, USA | |||
East Face | 1000ft | 5.4 [5+...] | alt lead: SL, ... second: MB | |
I lead the last pitch (250ft) and we moved together to avoid an oncoming storm. | ||||
15th August 1993 | Fifth Flatiron, Boulder, CO, USA | |||
East Face, South Side | 550ft | 5.4 (-,-,-) | lead, second: SL | |
A fast lead, using the full length of the rope on each pitch. | ||||
18th August 1993 | Duncan's Ridge, Horsetooth Res., Ft. Collins, CO, USA | |||
? | 40ft | 5.10 | top rope [x 2] | |
? | 40ft | 5.7 | top rope [x 2] | |
? | 40ft | 5.7 | top rope [x 2] | |
? | 40ft | 5.7 | top rope [x 2] | |
28th August 1993 | Torture Chamber, Horsetooth Res., Ft. Collins, CO, USA | |||
7 routes, 30 ft, top roped, 5.7 - 5.10? | ||||
18th September 1993 | Second Flatiron, Boulder, CO, USA | |||
Free For All [Pitches 1-4] | 500ft | 5.3 | alt lead: DJ | |
Retreated from just below the crux pitch in a heavy thunderstorm. | ||||
3rd October 1993 | Second Flatiron, Boulder, CO, USA | |||
Free For All | 1000ft | 5.6 (-,-,...,-,-) | lead, second: PM | |
16th October 1993 | Duncan's Ridge, Horsetooth Res., Ft. Collins, CO, USA | |||
5 routes, 30 ft, top rope. | ||||
24th October 1993 | Wyndcliffe, Wye Valley | |||
? | 40ft | ? | second, lead: MS | |
6th November 1993 | Goblin Combe, Avon | |||
Esgaroth | 50ft | HS (4b) | lead, second: LS | |
Saruman | 60ft | S (4a) | lead, second: LS | |
Gandalf | 60ft | VS (4c) | top rope | |
Elrond | 70ft | VS (4c) | lead, unseconded | |
5th December 1993 | Goblin Combe, Avon | |||
Bolg | 40ft | S (4a) | lead, second: FW | |
Shagrat | 70ft | E2 (5b) | top rope | |
Gollum | 70ft | HVS (5b) | top rope, rest | |
31st December 1993 | Glencoe, Scotland | |||
Sron Na Lairig [Winter] | 300m | II | alt lead: MB | |
My first winter climb. | ||||
1994 | ||||
21st January 1994 | Sea Walls, Avon Gorge, Bristol | |||
Idleburger Buttress | 80ft | VD | lead, second: WW | |
5th March 1994 | Sea Walls, Avon Gorge, Bristol | |||
Gronk [pitches 1-3] | 230ft | VS (4c,4b,4b,-) | lead, second: WW | |
Beaten by the clock, we finished up Morpheus at dusk. | ||||
12th March 1994 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare | 160ft | S (4a,-) | second, lead: MB | |
Floating Voter | 80ft | VS (4b) | lead, unseconded | |
It started to rain heavily, just after I'd made the committing crux moves. I continued to the bolts and abseiled. | ||||
19th March 1994 | Sea Walls, Avon Gorge, Bristol | |||
Entrail | 270ft | VS (5a,4c,4b) | lead, second: WW | |
The initial borehole was avoided to the left, with a tricky move to regain the line. Little protection to begin with. | ||||
20th March 1994 | Upper Tier, The Roaches, Peak District | |||
Right Route | 90ft | HD (-) | lead, seconds: DR, DG | |
A bitterly cold day. | ||||
26th March 1994 | Great Rock, Cheddar Gorge, Cheddar | |||
![]() |
410ft | VS (-,4a,-,4b,4b,-) | alt lead: FW | |
A climb with an expeditionary feel. Loose and vegetated in the lower half, excellent climbing on the top half. | ||||
10th April 1994 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk | 210ft | S (4a,-,-,4a) | lead, second: SL | |
Jumping Beans | 70ft | S | lead, second: SL | |
A good route, but hard for the grade. | ||||
11th April 1994 | The Amphitheatre, Avon Gorge, Bristol | |||
Rockers' Revenge | 140ft | VS (4b,4c) | alt lead: MB | |
13th April 1994 | The Amphitheatre, Avon Gorge, Bristol | |||
Sweat Shop [var] | 120ft | HS? (4a,4b?) | second, lead: MB | |
Unable to find the crucial peg on the top pitch we finished up the arête to the left. | ||||
15th April 1994 | Three Cliffs, Gower | |||
Right Corner | 18m | M | solo | |
16th April 1994 | Lewes Castle East, Gower | |||
Gethsemane | 31m | S (4a) | lead, second: BOC | |
16th April 1994 | King Wall, Gower | |||
Ragnarok | 29m | S (4a) | lead, second: BOC | |
Needle Crack | 21m | VS (4b) | lead, second: BOC | |
17th April 1994 | Little Star Wall, Gower | |||
Scout Crack | 12m | S (-) | lead, second: SL2 | |
24th April 1994 | Wintour's Leap, Wye Valley | |||
Central Rib Route III | 230ft | VD (-,-,-) | lead, seconds: NC, DR | |
27th April 1994 | Sea Walls, Avon Gorge, Bristol | |||
Daydream | 80ft | VS (5a) | lead, second: MB | |
Zebedee | 80ft | HVS (5a) | top rope | |
29th April 1994 | Suspension Bridge Buttress, Avon Gorge, Bristol | |||
Suspension Bridge Arête [var] | 110ft | HVS (5a) | second, lead: FW, second: WW | |
A direct line, keeping to the left of Suspense for the entire climb. | ||||
Suspense | 110ft | HVS (5a) | second, lead: FW, second: WW | |
1st May 1994 | Craig Cau, Cader Idris, Mid Wales | |||
Pencoed Pillar | 740ft | HVD [6] | lead, seconds: DR, WW | |
2nd May 1994 | Tap-y-Graig, Arans, Mid Wales | |||
Will-o'-the-Wisp | 310ft | HVD [6] | alt lead: WW, second: DR | |
3rd May 1994 | The Amphitheatre, Avon Gorge, Bristol | |||
Hodge's Pin | 60ft | VS (4c) | lead, seconds: LS, MB | |
Excellent climbing in poor surroundings. | ||||
I'm An Egon | 50ft | VS (4b?) | second, lead: MB | |
Easy for the grade, but with little protection. | ||||
4th May 1994 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare | 160ft | S (4a,-) | alt lead: MB, second: LS | |
7th May 1994 | Bosigran, West Penwith, Cornwall | |||
Doorpost | 185ft | HS (4a,4b,4a) | alt lead: FW, second: WW | |
Little Brown Jug | 210ft | VS (4b,4a,5a) | alt lead: FW, second: WW | |
Ochre Slab Route II | 120ft | S (4a,4a) | alt lead: FW | |
8th May 1994 | Sennen, West Penwith, Cornwall | |||
Church Window | 75ft | VD (-,4a) | lead, second: SL2 | |
Banana Flake | 85ft | VD (-) | lead, second: SL2 | |
Demo Route | 80ft | HS (4b,4b) | alt lead: FW | |
Letterbox [Direct Finish] | 90ft | S[+] (4b) [2] | alt lead: FW | |
Civvy Route | 85ft | HS (4b) | second, lead: FW | |
9th May 1994 | Chair Ladder, West Penwith, Cornwall | |||
Terrier's Tooth | 130ft | VD (-,-,-) | alt lead: WW | |
Flannel Avenue [var] | 205ft | S (4a,-,4a) | lead, second: WW | |
South Face Direct | 170ft | VS (4a,4c,4c,4a) | alt lead: FW | |
A truly stunning climb with an absorbing crux pitch. | ||||
10th May 1994 | The Amphitheatre, Avon Gorge, Bristol | |||
Giant's Cave Buttress [var] | 270ft | VS (4c,5a,4c) | alt lead: FW | |
12th May 1994 | Sea Walls, Avon Gorge, Bristol | |||
Gronk | 330ft | VS (4c,4b,4c,4a) | var lead: MS | |
I led all but the first pitch. By running the two 4b pitches together we completed the route in two hours. | ||||
14th May 1994 | Goblin Combe, Avon | |||
Bifur | 60ft | VS (4b) | lead, second: MB | |
Route March | 80ft | VS (4c) | second, lead: MB | |
Glamdring | 80ft | VS (4c) | lead, second: MB | |
Bilbo's Revenge | 60ft | HVS (5a) | second, lead: MB | |
Treebeard | 70ft | VS (4c) | lead, second: MB | |
The light drizzle turned to a downpour as I was ~20ft from the top. | ||||
15th May 1994 | Wintour's Leap, Wye Valley | |||
Early Morning Traverse | 1500ft | VS (4b) [15] | alt lead: FW, MB | |
A memorable route, but not for the climbing on it. Imagine climbing through a bush for seven hours. | ||||
23rd May 1994 | Black Rocks, Roinn A'Mhill, Reiff, Scotland | |||
Meikle Neuk | 10m | S | lead, second: DG | |
Hanging Groove | 10m | S | lead, second: DG | |
Slanting Corner | 10m | HS | lead, second: DG | |
Hanging Groove [var] | 10m | S | solo | |
Vee Slab | 10m | M | solo | |
Tystie Left Edge | 25m | S | lead, second: MB | |
Auld Nick [+ finish] | 25m | MS | lead, second: DG | |
Tystie Slab | 30m | VD | lead, second: DG | |
![]() |
20m | S | lead, second: DG | |
25th May 1994 | The Old Man of Stoer, Scotland | |||
![]() |
55m | VS (4a?,4b,4c) | alt lead: MB | |
My first sea stack and my first Tyrolean traverse. | ||||
30th May 1994 | Shorncliff, Wye Valley | |||
We climbed from 2pm to 10pm! | ||||
... One For All | 100ft | HS (4a) | lead, second: FW | |
State Of Independence | 60ft | VS (4c) | second, lead: FW | |
The Phoney War | 90ft | HS (4b) | lead, second: FW | |
All For One ... | 95ft | HVS (5a) | second, lead: FW | |
One Less White Nigger | 100ft | HVS (4c) | lead, second: FW | |
Emotional Dyslexia | 90ft | HVS (5a) | second, lead: FW | |
Last Call | 70ft | VS (5a) | lead, second: FW | |
Motion Pictures | 70ft | E1 (5b) | second, lead: FW | |
War Of The Worlds | 90ft | VS (4c) | lead, second: FW | |
The Laughing Cavaliers | 100ft | HVS (5b) | second, lead: FW | |
5th June 1994 | Avon Gorge, Bristol | |||
Unknown Area: Unknown Wall | 180ft | VS (-,4a,4c,4c) | alt lead: FW | |
Sea Walls: Gronk | 330ft | VS (4c,4b,4c,4a) | var lead: FW | |
7th June 1994 | Suspension Bridge Buttress, Avon Gorge, Bristol | |||
Limbo | 190ft | HVS (5b,4b) | alt lead: FW | |
8th June 1994 | The Amphitheatre, Avon Gorge, Bristol | |||
I'm An Egon | 50ft | VS (4b) | solo | |
Rockers' Revenge | 140ft | VS (4b,4c) | second, lead: WW, FW | |
Vegetable Without A Cause | 190ft | S (-) | lead, second: FW, WW | |
10th June 1994 | Upper Amphitheatre, Avon Gorge, Bristol | |||
Pocketed Wall | 60ft | VS (4c) | second, lead: MB, second: FW | |
In Through The Out Door | 70ft | VS (4b) | lead, second: FW, MB | |
Cave Left | 70ft | VS (4b) | second, lead: FW, second: MB | |
11th June 1994 | Subluminal Cliff, Swanage, Dorset | |||
Baboon | 50ft | VS (4c) | second, lead: FW | |
First Corner | 50ft | S (4a) | lead, second: FW | |
Spreadeagle | 50ft | VS (5a) | second: lead: FW | |
Double Chockstone | 50ft | HVD (-) | lead, second: FW | |
Transcript Direct | 50ft | VS (4c/5a) | second: lead: FW | |
Avernus | 70ft | S (4a) | lead, second: FW | |
Grandpa's Grope | 50ft | VS (4c) | second, lead: FW | |
Second Corner | 50ft | S (4a) | lead, second: FW | |
12th June 1994 | Wintour's Leap, Wye Valley | |||
Left Hand Route [var] | 290ft | HS (5a,4a,-,-) | lead, second: NC, DR | |
Due to route finding error I lead up an HVS (Gryke) passing the crux before I realised my error. I traversed back onto the route and continued to the stance. Nick couldn't follow the 4b crux of the proper line, so I abseiled down, top roped the first part of the pitch and set up a stance just above the crux to talk the others through it. | ||||
15th June 1994 | Sea Walls, Avon Gorge, Bristol | |||
Mobius | 230ft | HVS (5b,4c,4c) | alt lead: MB | |
After several attempts at the highly polished boulder start I managed it. Frog threw the rope up and I pulled up the gear to continue the first pitch. Protection is well spaced for the first two pitches. | ||||
16th June 1994 | Suspension Bridge Buttress, Avon Gorge, Bristol | |||
Hieronymous | 210ft | HVS (5a,5a) | alt lead: FW | |
Everything was going fine, until the last two feet. After several attempts and a rest on the nearby rib, it went. | ||||
18th June 1994 | Wintour's Leap, Wye Valley | |||
Left Hand Route/Bacchanalian | 290ft | HS (4b,4a,4a,4b) | var lead: FW | |
19th June 1994 | Wintour's Leap, Wye Valley | |||
Nibelheim [var] | 330ft | VS (4b,4a,4c,4b,4b) | var lead: MB | |
I lead the semi-circular chimney as the exit pitch. | ||||
The Angel's Girdle | 360ft | VS (4b,4b,5a,4c) | alt lead: MB | |
Right Hand Route [top pitch] | 100ft | S (4a) | second, lead: MB | |
22nd June 1994 | Sea Walls, Avon Gorge, Bristol | |||
Puke | 270ft | HVS (5a,5a,4c,4a) | var lead: FW | |
24th June 1994 | Sea Walls, Avon Gorge, Bristol | |||
Pronk [pitch 1] | 90ft | VS (4c) | lead, var second: MB | |
The rain caught up with Frog and he was lowered off. I abseiled to retrieve the gear. | ||||
26th June 1994 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk [top pitch] | 30ft | S (4a) | second, lead: SL, second: RL | |
Grobius | 280ft | VS (4c,4b,4c) | lead, second: SL, RL | |
A combination route comprising the first three pitches of Gronk (done as two) and the top pitch of Mobius. | ||||
27th June 1994 | Sea Walls, Avon Gorge, Bristol | |||
Pronk [pitches 2 & 3] | 330ft | VS (-,4b,4c) | alt lead: FW | |
We started up Syph to re-join the route, completed two new pitches and then escaped up Sleepwalk. I dropped several nuts on pitch 3 and retrieved all but one on abseil, only to find on return to the cliff-top that my abseil anchor had been removed by person or persons unknown. | ||||
Sleepwalk [pitches 3 & 4] | 90ft | S (-,4a) | second, lead: FW | |
29th June 1994 | Portishead Quarry, Avon | |||
Pickpocket | 150ft | HVS (5a) | lead, second: SL | |
The Brink Of Solarity | 150ft | HVS (4c) | lead, second: SL | |
30th June 1994 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk [pitches 1 & 2] | 120ft | S (4a) | lead, second: MB | |
Pronk [pitches 4 & 5] | 135ft | HS (4b,4a) | second, lead: MB | |
1st July 1994 | Boiler Slab, Gower | |||
Dulfer | 19m | S (4a) | lead, second: FW | |
Ayesha | 21m | VS (4c) | second, lead: FW | |
Direct | 21m | VS (4b) | lead, second: FW | |
Nemo | 18m | VS (4b) | second, lead: FW | |
2nd July 1994 | Paviland Main Cliff, Gower | |||
The Ring | 42m | HS (4b) | second, lead: FW | |
Shelob | 36m | HS (-,4b) | lead, second: FW | |
East Gully Groove | 36m | VS (4c) | second, lead: FW | |
Balrog | 42m | HS (4b) | lead, second: FW | |
8th July 1994 | Stanage Edge, Peak District | |||
Christmas Crack | 15m | HS (4b) | lead, second: MB | |
Right-Hand Trinity | 13m | HS (4b) | second, lead: MB | |
Central Trinity | 15m | VS (4c) | lead, second: MB | |
Via Media | 11m | VS (4c) | second, lead: MB | |
9th July 1994 | Stanage Edge, Peak District | |||
Tango Buttress | 12m | HS (5a) | lead, second: MB | |
Norse Corner Climb | 14m | HS (4c) | second, lead: MB | |
Inaccessible Crack | 18m | VS (4c) | lead, second: MB | |
High Neb Buttress | 12m | VS (4c) | lead, second: SL2, WW | |
Twisting Crack | 14m | S (-) | lead, second: BOC, MB | |
Gunter | 12m | VS (4c) | second, lead: MB | |
Straight Crack | 14m | S (4a) | lead, second: MB | |
Typhoon | 12m | HS (4b) | lead, second: WW | |
Ono | 8m | S (-) | lead, second: BOC, WW | |
Duo Crack Climb | 9m | D | solo | |
10th July 1994 | Froggatt Edge, Peak District | |||
Swimmers' Chimney | 11m | HVD (-) | lead, second: CS | |
Terrace Crack | 12m | VS (4b) | lead, second: WW | |
Holly Groove | 9m | VS (4c) | lead, second: SL2 | |
Tody's Wall | 18m | HVS (5a) | lead, second: HB | |
Green Gut | 14m | S (4a) | lead, second: MB | |
Straight and Narrow | 14m | E2 (5c) | top rope | |
12th July 1994 | Goblin Combe, Avon | |||
Gondolin | 70ft | VS (4b) | second, lead: SL, second: RL | |
Treebeard | 70ft | VS (4c) | lead, second: RL, SL | |
Legolas | 40ft | VS (4c) | lead, second: RL | |
13th July 1994 | Suspension Bridge Buttress, Avon Gorge, Bristol | |||
Hell Gates | 250ft | HVS (5a,5a,4b) | alt lead: FW | |
18th July 1994 | Wyndcliffe, Wye Valley | |||
Questor | 110ft | VS (4b) | lead, second: SL2, WW | |
Cadillac | 100ft | VS (4c) | second, lead: WW | |
20th July 1994 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus | 240ft | VD (4a,-,-) | lead, second: BOC | |
21st July 1994 | Wintour's Leap, Wye Valley | |||
Central Rib Route I | 230ft | S (-,4a,4a) | lead, second: BOC | |
23rd July 1994 | Carreg Wasted, Llanberis Pass, Snowdonia, Wales | |||
Crackstone Rib | 175ft | S (-,-,-) | lead, second: BOC, SL2 | |
The Wrinkle | 235ft | VD (-,-,-) | second, lead: SL2, second: BOC | |
Lion | 280ft | VS (4a,4c,-,4a) | lead, second: SL2 | |
24th July 1994 | Dinas Cromlech, Llanberis Pass, Snowdonia, Wales | |||
Flying Buttress | 300ft | HD [5] | alt lead: SL2, second: BOC | |
29th July 1994 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare [var] | 160ft | MVS (4a,4b) | lead, second: RL | |
Floating Voter | 80ft | VS (4b) | lead, second: RL | |
31st July 1994 | Three Cliffs, Gower | |||
Joggled Wall | 18m | VD (-) | lead, second: DR | |
Joggled Wall Direct | 18m | HS (4b) | lead, second: DR | |
Scavenger | 26m | VS (4b) | lead, second: DR | |
1st August 1994 | Great Tor, Gower | |||
East Ridge | 73m | VD (-,-,-) | lead, second: DR | |
1st August 1994 | Devil's Truck, Gower | |||
The Nose | 15m | HS (4a) | lead, second: DR | |
Gull Corner | 15m | VS (4b) | lead, unseconded | |
Legge | 9m | S (4a) | solo | |
6th August 1994 | Chudleigh Rocks, Devon | |||
Wogs | 120ft | HVD (-) | lead, second: WW | |
Never On Sunday | 120ft | HS (4a,4b) | lead, second: WW | |
Sarcophagus | 110ft | VS (4b) | lead, second: WW | |
7th August 1994 | The Dewerstone, Devon | |||
Central Groove | 160ft | HS (4b,4b) | lead, second: WW | |
Climbers' Club Ordinary | 170ft | VS (4b,4a,-) | var lead: WW, second: BOC | |
13th August 1994 | Main Area, Avon Gorge, Bristol | |||
Piton Route | 200ft | VS (4c,4a,4b) | var lead: FW | |
14th August 1994 | Promontory Slab, Baggy Point, Devon | |||
Shangri-La | 130ft | HS (4a) | second, lead: SL, second: RL | |
Urizen | 130ft | VS (4c) | lead, second: RL, SL | |
14th August 1994 | Long Rock Slab, Baggy Point, Devon | |||
Marion | 120ft | HS (4b) | second, lead: FW | |
Freddie | 100ft | HS (4b) | lead, second: FW | |
15th August 1994 | Sea Walls, Avon Gorge, Bristol | |||
Idleburger Buttress | 80ft | VD (-) | lead, second: AH | |
Floating Voter | 80ft | VS (4b) | lead, second: AH | |
17th August 1994 | Main Area, Avon Gorge, Bristol | |||
The Arête | 120ft | VD (-,-,4a) | lead, second: BS | |
Original Route | 110ft | D (-) | lead, second: BS | |
Darkness descended on us as I left Lunchtime Ledge. | ||||
19th August 1994 | Main Area, Avon Gorge, Bristol | |||
Sinister | 150ft | HS (4a,4b) | alt lead: FW | |
Petros | 90ft | VS (4c) | lead, second: FW | |
20th August 1994 | Sea Walls, Avon Gorge, Bristol | |||
Syph | 80ft | S (-) | lead, second: BOC | |
Nightmare | 160ft | S (4a,-) | lead, second: BOC | |
Idleburger Buttress | 80ft | VD (-) | lead, second: BOC | |
21st August 1994 | Main Area, Avon Gorge, Bristol | |||
Dawn Walk | 210ft | S (4a,-,-) | lead, second: WW | |
Direct Route | 90ft | S (4a) | lead, second: WW | |
22nd August 1994 | Sea Walls, Avon Gorge, Bristol | |||
Pronk [pitches 5-8] | 410ft | VS (4a,4b,4a,4c) | alt lead: FW | |
We started up a variant of Morpheus to reach the fourth stance of Pronk. We exited up the left arête of Rotten Row at dusk to top out in the dark, but the ice cream van had already gone. | ||||
27th August 1994 | Secteur de la Fissure, Ailefroide, France | |||
Derma Spray [pitch 1] | 40m | 4+ | flash | |
La Sandale | 15m | 3 | solo | |
28th August 1994 | Secteur de la Fissure, Ailefroide, France | |||
Le Benet Vole | 25m | 4+ | flash | |
Crac, Crac | 25m | 4 | flash | |
Go On | 20m | 4 | flash | |
Zython | 22m | 3+ | flash | |
30th August 1994 | Ailefroide, France | |||
La Fissure [pitches 1 & 2] | 200ft | 4+ | alt lead: MS | |
I was leading out of the first grotto when a thunderstorm started. We waited for the rain to ease off and abseiled off. | ||||
30th August 1994 | Secteur de la Fissure, Ailefroide, France | |||
Le Toboggan | 60m | 5,4+ | alt lead: MS, second: WW | |
Evry | 50m | 5+,5 | alt lead: MS | |
31st August 1994 | Secteur de la Tête de la Draye, Ailefroide, France | |||
[25] | 25m | 4+ | flash | |
31st August 1994 | St. Égrève, Grenoble, France | |||
Ballet Bross | 25m | 5+/6a | flash | |
Oncle Bins | 25m | 5 | flash | |
1st September 1994 | Lans-en-Vecors, Grenoble, France | |||
Nicolas | 55m | 3 | flash | |
Bergerac [var] | 25m | 5? | flash | |
2nd September 1994 | Mont Aguille, Vercors, France | |||
Voie Normale [not completed] | 400ft | 2/3 | alt lead: MS | |
By the time we reached La Vierge it was raining heavily; we abseiled back to the col. | ||||
3rd September 1994 | Le Cirque, Gorges Du Crossey, Grenoble, France | |||
Les Temps Modern | 12m | 5 | flash | |
Le Nain Fomaine | 12m | 5 | flash | |
Beau Tas | 12m | 5+ | flash | |
Sainte Acete | 12m | 4+/5 | flash | |
Djin Toniques | 12m | 4+ | flash | |
Pas La Peche | 12m | 6a | flash | |
Pale Appache | 12m | 4 | flash | |
Surbacabra | 12m | 6a | 2 falls | |
Cruel Dilemme | 12m | 4+ | flash | |
3rd September 1994 | St. Égrève, Grenoble, France | |||
Eperon Des Gosses Mythiques | 150m | 5,5,4 | alt lead: MS | |
18th September 1994 | Sea Walls, Avon Gorge, Bristol | |||
Pronk [first ascent] | 835ft | VS (4c) [10] | alt lead: MB, FW | |
The route took eight hours to complete. Sadly the second half did not live up to the first. | ||||
25th September 1994 | South East Crag, Glen Clova, Scotland | |||
Parapet Route Direct Start | 12m | HS | lead, second: DR | |
Flake Route | 40m | S | lead, second: DR | |
Sam's Start | 14m | S | lead, second: DR | |
Parapet Route | 45m | MVS (4b) | lead, second: DR | |
Central Crack | 45m | HS | lead, second: DR | |
26th September 1994 | Upper North West Crag, Glen Clova, Scotland | |||
Alder | 40m | MVS (4b,4b) | lead, second: NC, DR | |
27th September 1994 | North Peak, The Cobbler, Scotland | |||
Right Angled Gully, Direct Finish | 36m | S | lead, second: DG, DR, NC | |
8th October 1994 | Main Area, Avon Gorge, Bristol | |||
Central Rib | 240ft | VS (4b,4a,4c) | lead, second: WW | |
Piton Route | 200ft | VS (4c,4a,4b) | lead, second: WW | |
9th October 1994 | Wintour's Leap, Wye Valley | |||
Swallow's Nest | 90ft | VS (4b) | lead, second: FW | |
Freedom | 100ft | VS (4b,4c) | var lead: FW | |
Central Route/Bacchanalian | 340ft | VS (4b,4b,4b,4a,4b) | var lead: FW | |
23rd October 1994 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus | 240ft | VD (4a) | solo | |
Sleepwalk | 210ft | S (4a) | solo | |
Nightmare | 160ft | S (4a) | solo | |
6th November 1994 | Avon Gorge, Bristol | |||
Sea Walls: Idleburger Buttress | 80ft | VD (-) | solo | |
Main Area: The Arête/Original Route | 230ft | VD (4a) | solo | |
3rd December 1994 | Main Area, Avon Gorge, Bristol | |||
Piton Route | 200ft | VS (4c,4a,4b) | lead, second: SL, RL | |
4th December 1994 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk | 210ft | S (4a,-,4a) | lead, second: DR | |
1995 | ||||
25th February 1995 | Sea Walls, Avon Gorge, Bristol | |||
"Direct" Finish to Pronk [first ascent]" | 350ft | VS (4a,4a,4c,4c,4b) | lead, second: WW | |
The first ascent of the two 4c pitches makes Pronk a worthwhile 8 pitch route. | ||||
25th March 1995 | Wyndcliffe, Wye Valley | |||
Cadillac | 100ft | VS (4c) | lead, second: FW | |
Questor | 110ft | VS (4b) | second, lead: FW | |
Klute | 80ft | VS (4c) | lead, second: FW | |
2nd April 1995 | Wintour's Leap, Wye Valley | |||
Zelda | 180ft | HS (4b,4b) | lead, second: RL | |
Left Hand Route/Bacchanalian | 290ft | HS (4b,4a,4a,4b) | alt lead: MB | |
9th April 1995 | Castle Rock, Cleeve Hill, Cotswolds | |||
6 routes, 25 ft, solo, VD - HS. | ||||
12th April 1995 | The Amphitheatre, Avon Gorge, Bristol | |||
Giant's Cave Buttress [var] | 270ft | VS (4c,5a,4c) | lead, second: MB | |
23rd April 1995 | Churchill Rocks, Avon | |||
Tyro's Crack | 110ft | D (-) | lead, second: CK | |
Caroline's first climb. | ||||
Dilemma Zig Zag | 110ft | S (-) | solo | |
The Right-Hand Slab | 80ft | D | solo | |
27th April 1995 | Main Area, Avon Gorge, Bristol | |||
Sinister | 150ft | HS (4a,4b) | lead, second: SL | |
Petros | 90ft | VS (4c) | lead, second: SL | |
30th April 1995 | Sea Walls, Avon Gorge, Bristol | |||
Floating Voter | 80ft | VS (4b) | lead, second: NC | |
Syph | 80ft | S (-) | lead, second: DG, DR | |
Grobius | 280ft | VS (4c,4b,4c) | lead, second: NC | |
3rd May 1995 | The Amphitheatre, Avon Gorge, Bristol | |||
Fossible | 120ft | VS (4a,4b) | alt lead: FW | |
Rockers' Revenge | 140ft | VS (4b,4c) | alt lead: FW | |
5th May 1995 | Main Area, Avon Gorge, Bristol | |||
Piton Route | 200ft | VS (4c,4a,4b) | lead, second: MS | |
7th May 1995 | Scrattling Zawn, Baggy Point, Devon | |||
Scrattling Crack | 120ft | VD (-) | lead, second: FW | |
Moonshot | 130ft | D (-) | solo: FW | |
10th May 1995 | Main Area, Avon Gorge, Bristol | |||
The Corner | 210ft | VS (4b,4c,4b) | alt lead: FW | |
Bob's Climb [pitch 2] | 50ft | VD (-) | second, lead: FW | |
13th May 1995 | Sea Walls, Avon Gorge, Bristol | |||
Syph | 80ft | S (-) | solo [x 2] | |
20th May 1995 | Bosigran, West Penwith, Cornwall | |||
Alison Rib | 160ft | D [2] | lead, second: CK | |
Fafnir | 120ft | D [2] | lead, second: SG | |
Sarah's first (outdoor) climb. | ||||
21st May 1995 | Sennen, West Penwith, Cornwall | |||
Vertical Crack | 70ft | HS (4c) | lead, second: FW | |
Double Overhang | 60ft | VS (4c) | second, lead: FW | |
Overhanging Corner | 75ft | VS (4c) | lead, second: FW | |
Africa Route | 60ft | VS (5a) | second, lead: FW | |
21st May 1995 | Chair Ladder, West Penwith, Cornwall | |||
Diocese | 200ft | VS (4c,5a,4a,4b) | alt lead: FW | |
23rd May 1995 | Sennen, West Penwith, Cornwall | |||
Demo Route | 80ft | HS (4b) [2] | var lead: WW | |
Staircase | 60ft | D (-) | lead, second: CK | |
15th June 1995 | Main Area, Avon Gorge, Bristol | |||
Reveille [var] | 190ft | VS (4c,4b) | alt lead: FW | |
Aftermath | 60ft | VS (4c) | second, lead: FW | |
17th June 1995 | Stanage Edge, Peak District | |||
Right Twin Crack | 11m | VS (4c) | lead, second: SL2 | |
Led after failing repeatedly on Ellis's Eliminate. | ||||
Balcony Buttress | 17m | S (-) | var lead: SL2 | |
Martello Buttress [var] | 17m | HS (-) | lead, second: SL2 | |
The Nose | 10m | VS (4b) | lead, second: SL2 | |
Verandah Buttress | 12m | HVD (5b) | lead, second: SL2 | |
Verandah Cracks | 8m | D (-) | solo | |
Butcher Crack | 11m | HVS (5b) | top rope | |
18th June 1995 | Stanage Edge, Peak District | |||
Prospero's Climb | 12m | VD (-) | second, lead: SL | |
The Pinion | 14m | VD (-) | lead, second: SL | |
The Crab Crawl | 11m | S (-) | lead, second: SL | |
February Crack | 6m | HS (4b) | lead, second: SL | |
Twin Cracks | 6m | VD (-) | solo | |
Arrow Crack | 6m | VS (5a) | top rope | |
Avril | 6m | S (-) | var lead: SL | |
27th June 1995 | Main Wall, Avon Gorge, Bristol | |||
Malbogies | 210ft | HVS (5a,4c) | alt lead: FW | |
We found a football at the bottom of the climb which we carried up the route. | ||||
16th July 1995 | Wintour's Leap, Wye Valley | |||
Greta | 210ft | HS (4b,4b,4a) | lead, second: WW | |
Nibelheim | 290ft | VS (4b,4a,4c,4a) | alt lead: WW | |
6th August 1995 | Wintour's Leap, Wye Valley | |||
Central Rib Route III | 230ft | VD (-,-,-) | second, lead: DG,DR | |
Zelda | 180ft | HS (4b,4b) | lead, second: DG | |
21st August 1995 | Hill Billy Rock, Boulder, CO, USA | |||
East Face South Side | 420ft | F3 [3] | lead, second: CK | |
28th August 1995 | Polldubh Crags, Glen Nevis, Scotland | |||
South-west Buttress: Tear | 45ft | HS | solo | |
As this route wasn't in our guidebook. I soloed it in big boots and pronounced it OK for Dave to lead at about V Diff. | ||||
South-west Buttress: Tear | 45ft | HS (-) | second, lead: DR, second: MB | |
Pine Wall: Pine Wall | 220ft | MS (-,-) | alt lead: MB, second: DR | |
24th September 1995 | Main Area, Avon Gorge, Bristol | |||
Central Gully | 180ft | S (4a,4a) | lead, second: DR, NC | |
On bringing up the second rope we found that Nick hadn't tied on, so I down-climbed the first pitch with both ropes, re-clipping the gear and then re-ascended followed by Nick. | ||||
1st October 1995 | Castle Rock, Cleeve Hill, Cotswolds | |||
3 routes, 25 - 30ft, top rope, VD - HS. 1 route, 25ft, solo, VD. | ||||
28th October 1995 | Main Area, Avon Gorge, Bristol | |||
Dawn Walk | 260ft | S (-,4a,-,-) | lead, second: RL | |
Bob's Climb | 100ft | VD (-) | lead, second: RL | |
1996 | ||||
16th February 1996 | Sea Walls, Avon Gorge, Bristol | |||
Idleburger Buttress | 80ft | VD (-) | lead, second: RL | |
Jumping Beans | 70ft | S (-) | lead, second: RL | |
24th February 1996 | Stob Coire Nan Lochan, Glencoe, Scotland | |||
![]() |
175m | II [5] | var lead: MB, SF | |
On arriving at the narrow arête the party above us had got their rope jammed and the leader had untied(!) and soloed off. With several parties below us and dusk approaching we assisted the stranded second and then traversed left under the arête. | ||||
10th March 1996 | Wintour's Leap, Wye Valley | |||
Left Hand Route/Bacchanalian | 290ft | HS (4b,4a,4a,4b) | lead, second: RL | |
4th May 1996 | Dyer's Lookout, Culm Coast, Devon | |||
Clover | 110ft | S[+] | lead, second: MW | |
Choss Sticks | 400ft | ? [3] | alt lead: SF | |
Sean and I effected an escape after being trapped by high tide by climbing three loose pitches. | ||||
5th May 1996 | Higher Sharpnose Point, Culm Coast, Cornwall | |||
Traverses of the slabs. Bouldering. Soloing slabs to 50ft. | ||||
6th May 1996 | Gull Rock, Culm Coast, Devon | |||
Solid Air | 70ft | HS (4a) | lead, second: MW | |
Argonaut | 80ft | VS (4c) | second, lead: MW | |
2nd June 1996 | Sennen, West Penwith, Cornwall | |||
Church Window | 75ft | VD (-,4a) | alt lead: RL | |
I fell whilst attempting the HVS variation on the second pitch and Ruth was pulled from her stance. | ||||
Andrimne | 60ft | S (4a) | lead, second: WW | |
Intermediate Route | 70ft | VD (-) | second, lead: WW | |
4th June 1996 | Bosigran, West Penwith, Cornwall | |||
Bosigran Ridge | 600ft | VD [5] | var lead: WW, second: RL | |
5th June 1996 | Sennen, West Penwith, Cornwall | |||
Black Slab | 100ft | VD (-) | lead, second: RL | |
Staircase | 60ft | D (-) | lead, second: RL | |
6th June 1996 | Chair Ladder, West Penwith, Cornwall | |||
Pegasus | 180ft | HS (4b,4a,4a,4b) | lead, second: WW | |
23rd June 1996 | Birchen Edge, Peak District | |||
Porthole Direct | 50ft | HS (4b) | lead, second: LS, MB | |
Captain's Crawl | 50ft | M | solo | |
Monument Chimney | 50ft | D (-) | second, lead: MB | |
Nelson's Slab | 55ft | HS (4b) | lead, second: MB | |
Sail Chimney | 50ft | HVD (-) | second, lead: MB | |
Sail Buttress | 55ft | HS (4b) | lead, second: MB | |
14th September 1996 | Pobbles Bay, Gower | |||
First Slab | 9m | D (-) | lead, second: PS | |
Soap Gut (?) | 9m | D (-) | second, lead: PS | |
Shy Slab (?) | 9m | VD (-) | lead, second: PS | |
Main Wall | 11m | S (-) | second, lead: PS | |
Gwyn's Route | 11m | HS (-) | lead, second: PS | |
Inbetweener | 11m | VD (-) | solo | |
Left Corner | 11m | VD (-) | solo | |
14th September 1996 | Three Cliffs, Gower | |||
Initiation Flake | 12m | S (-) | second, lead: PS | |
Quartz Corner | 16m | HS (-) | second, lead: PS | |
Spouse Crack | 16m | S (-) | lead, second: PS | |
15th September 1996 | King Wall, Gower | |||
Fafnir | 21m | S (4a) | second, lead: PS | |
King Route | 21m | VD (-) | lead, second: PS | |
Needle Crack | 21m | VS (4b) | second, lead: PS | |
Thor | 21m | S (4a) | lead, second: PS | |
Balder | 21m | VS (5a) | second, lead: PS | |
Vorder | 21m | S (4a) | lead, second: PS | |
15th September 1996 | Fall Bay Buttress, Gower | |||
Osiris | 36m | VS (4c) | second, lead: PS | |
1997 | ||||
16th March 1997 | Wintour's Leap, Wye Valley | |||
Bottle Buttress | 260ft | VD (-,-,-,-) | alt lead: MB | |
The only description we had of this route was that there was "a sloping ramp on the third pitch". | ||||
16th April 1997 | Main Area, Avon Gorge, Bristol | |||
The Arête | 120ft | VD (4a) | lead, second: SR | |
Original Route | 110ft | D (-) | lead, second: SR | |
1st May 1997 | Wintour's Leap, Wye Valley | |||
Original Route | 210ft | VD (-,-,-,-) | alt lead: MB | |
4th July 1997 | Sea Walls, Avon Gorge, Bristol | |||
Sleepwalk | 210ft | S (4a,-,-,4a) | lead, second: SR | |
During the climb I was hit on the arm and Susi was hit on the head by rocks thrown from above. Fortunately I had lent Susi a helmet. | ||||
6th July 1997 | Wintour's Leap, Wye Valley | |||
Central Rib Route I | 230ft | S (-,4a,-) | lead, second: SR | |
8th July 1997 | Main Area, Avon Gorge, Bristol | |||
Sinister | 150ft | HS (4a,4b) | alt lead: WW | |
Petros | 90ft | VS (4c) | second, lead: WW | |
Possibly a little ambitious given the form of the party. We just managed to top out before dark. | ||||
25th July 1997 | Gardom's Edge, Peak District | |||
NMC Crack | 15m | HD (-) | lead, second: SR, RL | |
Apple Crack | 15m | HD (-) | lead, second: SR, RL | |
Apple Arête | 15m | VS (4b) | top rope | |
26th July 1997 | Birchen Edge, Peak District | |||
Trafalgar Crack | 14m | VD (4a) | second, lead: RL, second: SR | |
The Chain | 13m | VD (-) | lead, second: RL | |
Right Ladder Chimney | 13m | VD (-) | lead, second: DR | |
Kiss Me Hardy | 13m | S (4a) | lead, second: DR, NC | |
The Funnel | 13m | D (-) | lead, second: DR | |
27th July 1997 | Froggatt Edge, Peak District | |||
Trapeze | 14m | VD (-) | lead, second: SR, RL | |
Allen's Slab | 15m | S (-) | lead, second: SR, RL | |
Swimmers' Chimney | 11m | HVD (-) | second, lead: RL | |
Heather Wall | 17m | HVD (-) | lead, second: SR, RL | |
![]() |
8m | HS (4b) | lead, second: RL | |
Green Gut | 14m | S (4a) | second, lead: RL, second: SR | |
9th August 1997 | Main Area, Avon Gorge, Bristol | |||
Central Gully | 180ft | S (4a,4a) | alt lead: SL, second: RL | |
8th September 1997 | Craig Coetan, Pembroke | |||
Zig-Zag | 150ft | D (-,-) | lead, second: WW | |
Central Route | 150ft | S (4a,4a) | lead, second: WW | |
Flake-Fake | 170ft | HS (4b,4a) | alt lead: WW | |
9th September 1997 | Llenrac Slabs, Pembroke | |||
`Im | 90ft | S (-) | lead, second: WW | |
Traverse to... | 60ft | VS? | lead, second: WW | |
Royle Flush | 90ft | S (4a) | lead, second: WW | |
Robbin's Bow | 100ft | VS (4b) | lead, second: WW | |
Plunging Plonker | 70ft | S (-) | lead, second: WW | |
10th September 1997 | Trwyn Llwyd Slabs, Pembroke | |||
Mur Meryl | 150ft | S (4a) | lead, second: WW | |
10th September 1997 | Craig Coetan, Pembroke | |||
Silmaril | 150ft | S (4a,4a) | lead, second: WW | |
Libra | 140ft | S (4a,4a) | lead, second: WW | |
11th September 1997 | Initiation Slabs, St. Non's Bay, Pembroke | |||
Capricorn | 70ft | HS (4b) | lead, second: WW | |
Versary Slab | 70ft | S (4a) | lead, second: WW | |
11th September 1997 | Porth-clais, Pembroke | |||
Red Wall | 70ft | S (4a) | lead, second: WW | |
15th September 1997 | Sennen, West Penwith, Cornwall | |||
Orange Slice | 85ft | VD (-) | lead, second: SR | |
Junior's Route | 70ft | D (-) | lead, second: SR | |
Corner Climb | 70ft | VD (-) | lead, second: SR | |
16th September 1997 | Bosigran, West Penwith, Cornwall | |||
Black Slab | 110ft | D [3] | lead, second: SR | |
17th September 1997 | Bosigran, West Penwith, Cornwall | |||
Ledge Climb | 170ft | VD [4] | lead, second: SR | |
Big Top | 90ft | VD (-) | lead, second: SR | |
18th September 1997 | Land's End, West Penwith, Cornwall | |||
Land's End Long Climb | 230ft | VD [7] | lead, second: SR | |
Susi avoided both jumps and The Green Face. | ||||
19th September 1997 | Porthgwarra Buttress, West Penwith, Cornwall | |||
Porthgwarra Face (Dowser's Route) | 110ft | VD [3] | lead, second: SR | |
Susi avoided the final variation pitch and finished directly. | ||||
4th October 1997 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus | 240ft | VD (4a,-,-,-) | alt lead: MB | |
1998 | ||||
14th February 1998 | Wintour's Leap, Wye Valley | |||
Corner Buttress Route I | 210ft | VD (-,4a,-) | alt lead: MB | |
Direct Route [var] | 200ft | VD (-,-,-) | alt lead: MB | |
15th February 1998 | Cheddar Gorge, Cheddar | |||
Wind Rock: The Slab | 60ft | VD (-) | lead, second: MB | |
Acid Rock: Knight's Climb | 180ft | D (-,-,-) | alt lead: MB | |
High Rock: Jill | 80ft | S (4a) | lead, second: MB | |
Heart Leaf Bluff: Humerus | 50ft | S (-) | second, lead: MB | |
15th March 1998 | Avon Gorge, Bristol | |||
Main Area: The Arête/Original Route | 230ft | VD (4a) | solo | |
Sea Walls: Sleepwalk | 210ft | S (4a) | solo | |
The Amphitheatre: Botanists' Dilemma | 120ft | D (-) | solo | |
21st March 1998 | Dow Crag, Coniston, Lake District | |||
Gordon and Craig's Route | 300ft | HVD (-,-,-,-) | alt lead: MB | |
Murray's Route | 250ft | S (-,-,-) | alt lead: MB | |
31st March 1998 | Sea Walls, Avon Gorge, Bristol | |||
Gronk | 330ft | VS (4c,4b,4c,4a) | alt lead: WW | |
7th April 1998 | Main Area, Avon Gorge, Bristol | |||
Central Gully | 180ft | S (4a,4a) | alt lead: WW | |
18th April 1998 | Shorncliff, Wye Valley | |||
... One For All | 100ft | HS (4a) | second, lead: WW | |
... Think Of England | 70ft | VS (4b) | lead, second: WW | |
The Phoney War | 90ft | HS (4b) | second, lead: WW | |
2nd May 1998 | Wintour's Leap, Wye Valley | |||
Bottle Buttress | 260ft | VD (-,-,-,-) | alt lead: DG | |
Left Hand Route/Bacchanalian | 290ft | HS (4b,4a,4a,4b) | var lead: DG | |
2nd May 1998 | St. Govan's Head, Range East, Pembroke | |||
Cupid's Bow [var] | 130ft | HVS (5a) | second, lead: MW | |
The initial moves were avoided by traversing in from the start of Flanker, where I spent some time removing an in-situ nut, believing Mathias had placed it on lead. | ||||
3rd May 1998 | Stennis Head, Range East, Pembroke | |||
![]() |
60ft | VS (4b) | lead, second: MW, WW | |
Quickstep | 60ft | VS (4b) | second, lead: MW, second: WW | |
![]() |
100ft | HVS (5a) | second, lead: MW | |
3rd May 1998 | Range East, Pembroke | |||
Bosherton Head: Ocean Passage [var] | 150ft | VS (4c?,4a) | second, lead: MW, WW | |
Mathias took a more direct (and harder) line to the first stance. Will followed up the original line. | ||||
Saddle Head: Sea Mist | 90ft | HS (4a) | lead, second: WW, MW | |
4th May 1998 | Flimston Bay, Range East, Pembroke | |||
![]() |
140ft | HS (4a) | lead, second: WW, MW | |
![]() |
150ft | HS (4b) | lead, second: WW | |
The Gadfly | 140ft | VS (4c) | second, lead: MW, second: WW | |
15th May 1998 | Sea Walls, Avon Gorge, Bristol | |||
Nightmare | 160ft | S (-,4a,-) | lead, second: DG | |
Sleepwalk | 210ft | S (4a,-,4a) | lead, second: DG | |
16th May 1998 | Wintour's Leap, Wye Valley | |||
Right Hand Route [var] | 330ft | HS (4b,4a,4b,4a,4b) | alt lead: MB | |
We climbed the first pitch of Nibelheim and the semi-circular exit chimney. | ||||
27th May 1998 | Stac An Eich, Loch Linnhe, Scotland | |||
Heather Rib | 25m | VD | lead, second: DG | |
Let down by a poor unstable vegetated finish (or maybe I was off route). | ||||
Appin Groove | 10m | HS | lead, second: DG | |
29th May 1998 | Buachaille Etive Mor, Glencoe, Scotland | |||
January Jigsaw | 85m | S [4] | lead, second: DG | |
7th June 1998 | The Amphitheatre, Avon Gorge, Bristol | |||
Giant's Cave Buttress | 270ft | VS (4c,-,4c) | alt lead: PS | |
7th June 1998 | Main Area, Avon Gorge, Bristol | |||
Piton Route | 200ft | VS (4c,4a,4b) | var lead: PS | |
Dawn Walk | 210ft | S (4a,-,-) | alt lead: PS | |
Bob's Climb | 100ft | VD (-,-) | alt lead: PS | |
30th/31st July 1998 | Mont Aguille, Vercors, France | |||
Voie Normale | 500m | PD (2/3) | partners: SL,RL | |
We bivvied on the summit and woke up to a fast approaching lightning storm. We quickly gathered our gear up and abseiled down. | ||||
7th August 1998 | Winterbourne Down, Bristol | |||
I broke my right thumb in two places and ruptured a ligament in a cycling accident. This curtailed my climbing activities for the rest of the year. | ||||
1999 | ||||
1st April 1999 | Sea Walls, Avon Gorge, Bristol | |||
Morpheus | 240ft | VD (4a,-,-,-) | alt lead: WW | |
My first climb since I broke my thumb in a cycling accident on 7th August 1998. There was a football sized loose block at the penultimate stance, which I dislodged and it fell down the route. | ||||
1st May 1999 | Boiler Slab, Gower | |||
![]() |
19m | VD (-) | lead, second: DG, DG2 | |
Dulfer | 19m | S (4a) | lead, second: DG, DG2 | |
Pinnacle Crack | 24m | VD (-) | second, lead: DG, second: DG2 | |
2nd May 1999 | White Pillar, Gower | |||
West Kante | 30m | S (-) | lead, second: DG | |
Grey Slab | 27m | S (-) | lead, second: DG | |
14th May 1999 | A'Chioch, Sgurr a'Chaorachain, Applecross, Scotland | |||
![]() |
135m | VD [5] | lead, second: DG | |
![]() |
80ft | S (-) | lead, second: DG | |
13th June 1999 | Wintour's Leap, Wye Valley | |||
Central Rib Route I | 230ft | S (-,4a,4a) | alt lead: DG | |
We did the first pitch of Central Rib Route III | ||||
![]() |
330ft | HS (4b,4a,4b,4a) | alt lead: DG | |
We did the first pitch of Nibelheim (but not the semi-circular exit pitch) | ||||
17th June 1999 | Wintour's Leap, Wye Valley | |||
John's Route | 200ft | HS (4b,4b,-) | alt lead: FW | |
9th July 1999 | Wintour's Leap, Wye Valley | |||
Greta | 210ft | HS (4b,4b,4a) | lead, second: DG | |
20th July 1999 | Goblin Combe, Avon | |||
Esgaroth | 50ft | HS (4b) | lead, second: DG | |
Saruman | 60ft | S (4a) | lead, second: DG | |
The Gnome King | 60ft | HS (4b) | lead, second: DG | |
19th August 1999 | Trewavas Head, West Penwith, Cornwall | |||
Bending Chimney | 55ft | VD | top rope | |
Bramble | 50ft | VD | top rope | |
Mouseproof | 45ft | S (4b) | top rope | |
28th August 1999 | Stanage Edge, Peak District | |||
Mississippi Chimney | 18m | VD (-) | second, lead: MB | |
Balcony Buttress | 17m | S (-) | lead, second: MB | |
Amazon Crack | 13m | S (-) | second, lead: MB | |
Martello Buttress | 17m | HS (-) | lead, second: MB | |
Heaven Crack | 10m | VD (-) | second, lead: MB | |
Curving Chimney | 15m | D (-) | lead, second: MB | |
I lead in my Wildebeestes, Frog followed in his sandals. | ||||
29th August 1999 | Stanage Edge, Peak District | |||
Limbo | 12m | S (-) | second, lead: MB | |
Tango Crack | 12m | VD (-) | lead, second: MB | |
Eckhard[?]'s Arête | 12m | S (-) | second, lead: MB | |
Eric's Eliminate | 14m | S (-) | lead, second: MB | |
Twisting Crack | 14m | S (-) | second, lead: MB | |
Aries | 10m | S (-) | lead, second: MB | |
29th August 1999 | Burbage North, Peak District | |||
Green Crack | 8m | VD | second, lead: MB | |
First climb in my new boots (Scarpa Helix). | ||||
![]() |
10m | HS | lead, second: MB | |
Wobblestone Crack | 8m | HVD | second, lead: MB | |
4th September 1999 | Idwal Slabs, Snowdonia, Wales | |||
East Wall Girdle | 175m | VS (4a,-,4a,4b,4b,4b) | var lead: PS | |
5th September 1999 | Lliwedd, Snowdonia, Wales | |||
![]() |
300m | S [11] | var lead: PS | |
11th September 1999 | Chudleigh Rocks, Devon | |||
Wogs | 120ft | HVD | second, lead: PS | |
Salome | 50ft | S (4a) | lead, second: PS | |
Tar Baby [var] | 90ft | S (4a) | second, lead: PS | |
Squirrel | 60ft | HS (4a) | lead, second: PS | |
Reek | 60ft | HS (4b) | second, lead: PS | |
Ashtree Buttress | 50ft | VD | lead, second: PS | |
Sarcophagus | 110ft | VS (4b) | second, lead: PS | |
Nexus | 95ft | S (4a) | lead, second: PS | |
2000 | ||||
26th February 2000 | Main Area, Avon Gorge, Bristol | |||
Dawn Walk | 210ft | S (4a,-,-) | var lead: MB | |
Bob's Climb | 100ft | VD (-,-) | alt lead: MB | |
29th April 2000 | Main Area, Avon Gorge, Bristol | |||
Sinister | 150ft | HS (4a,4b,4a) | lead, second: DG | |
Direct Route | 90ft | S (4a) | lead, second: DG | |
The Arête | 120ft | VD (-,4a) | alt lead: DG | |
Original Route | 110ft | D (-) | lead, second: DG | |
30th April 2000 | The Dewerstone, Devon | |||
Route B [var] | 150ft | HVD [4] | alt lead: DG | |
Dave led the fourth pitch variation. | ||||
Colonel's Arête | 130ft | VD [4] | alt lead: DG | |
Central Groove | 160ft | HS (4b,4b) | lead, second: DG | |
14th May 2000 | Creagan A'Choire Etchachan, Cairngorm, Scotland | |||
The Talisman | 330ft | HS (-,4a,-) | alt lead: SL | |
An superb day out - a seven mile walk in (and walk out) through the Cairngorms, a 20m snow pitch to reach the base of the climb, and an excellent route. | ||||
7th July 2000 | Cow & Calf Rocks, Ilkley, Yorkshire | |||
The Cow: 'A' Climb | 25m | S (-,-,4b) | alt lead: SL, RL | |
The Quarry: Josephine Direct | 16m | HS (4b) | lead, second: RL, SL | |
The Quarry: Blucher | 15m | VS (4c) | lead, second: RL | |
I fell several times while trying to pull over the top on the final moves. | ||||
8th July 2000 | Rocky Valley, Ilkley, Yorkshire | |||
Number 3 Buttress: Three Slab Route | 11m | VD (-) | second, lead: RL, second: SL | |
Number 3 Buttress: The Flake Climb | 15m | S (-) | lead, second: RL, SL | |
Number 2 Buttress: Stiction Chimney | 9m | VD (-) | second, lead: SL, second: RL | |
Number 6 Buttress: Spreadeagle | 15m | HS (4b) | lead, second: RL, SL | |
An excellent route. | ||||
26th August 2000 | Wintour's Leap, Wye Valley | |||
Bottle Buttress | 260ft | VD (-,-,-,-) | alt lead: PS | |
I took an ego bruising fall at the start of the first pitch. | ||||
Greta | 210ft | HS (4b,4b,4a) | alt lead: PS | |
2001 | ||||
12th May 2001 | South Face, Cir Mhor, Arran, Scotland | |||
Sou Wester Slabs | 540ft | VD (4a) [7] | var lead: SL, RL | |
8th July 2001 | Wintour's Leap, Wye Valley | |||
Central Rib Route III | 230ft | VD (-,-,-) | alt lead: DG | |
Duncan and Andy did Central Rib Route I | ||||
2003 | ||||
31st May 2003 | Upper Tier, The Roaches, Peak District | |||
Crack and Corner | 35m | S (4c,4a) | lead, second: PS | |
The initial moves took a bit of experimentation, but finally came together. | ||||
Pedestal Route | 27m | HVD (-,-) | lead, second: PS | |
Inverted Staircase | 21m | D (-,-) | alt lead: PS | |
13th July 2003 | Hen Cloud, Peak District | |||
The Arête | 30m | VD (-) | lead, second: DG2 | |
K2 | 30m | S (-,-) | alt lead: DG2 | |
Central Climb | 36m | HS (4a,-,-,-) | alt lead: PS, second: DG | |
The first pitch was a desperate thrutchfest, that finally yielded on the second attempt - which would probably have been smoother (although less of a spectator sport) if I'd had some larger gear with me (and wouldn't have required me to experiment with stacked hexes). | ||||
2004 | ||||
9th May 2004 | Wintour's Leap, Wye Valley | |||
Corner Buttress Route I | 210ft | VD (-,4a,-,-) | var lead: DG, DG2 | |
Corner Buttress Route II | 210ft | VD (-,4a,-) | alt lead: DG, DG2 | |
31st July 2004 | Wyndcliffe, Wye Valley | |||
Strike | 130ft | HS (4b) | second, lead: PS, second: DG | |
Monsoon | 130ft | S (4a) | lead, second: PS, DG | |
2005 | ||||
19th June 2005 | Clogwyn yr Oen, Moelwyns, Snowdonia, Wales | |||
Chic? | 68m | VD (-,-,-,-) | alt lead: PS | |
We thought we were climbing Slick, but in fact we climbed a line left of it (which explains why it didn't quite match up with the topo diagram in the guide book). | ||||
19th June 2005 | Craig y Wrysgan, Moelwyns, Snowdonia, Wales | |||
Y Gelynen/Honeysuckle Corner | 90m | S (-,-) | alt lead: PS | |
2006 | ||||
9th June 2006 | Inaccessible Pinnacle, Sgurr Dearg, Skye, Scotland | |||
East Ridge | 45m | M | lead: DG2 | |
We moved together on a doubled rope. | ||||
2007 | ||||
15th September 2007 | Wintour's Leap, Wye Valley | |||
Central Rib Route I | 230ft | S (-,4a,-,4a) | var lead: SG2, DG2 | |
We did the first pitch of Central Rib Route III. | ||||
Left Hand Route/Right Hand Route | 290ft | HS (4b,4a,4a) | alt lead: SG2 | |
We did the first two pitches of Left Hand Route and the top pitch of Right Hand Route. | ||||
2008 | ||||
29th June 2007 | Wintour's Leap, Wye Valley | |||
Central Rib Route I | 230ft | S (-,4a,-,4a) | var lead: PS, DG | |
We did the first pitch of Central Rib Route III. | ||||
Total Number of Routes | 716 |
Total Length (m) | 28,044 |
Total Length (ft) | 91,949 |
Partner | Name | # Routes | Total Length | ||
---|---|---|---|---|---|
1. | MB | Mark Bailey | 97 | 5,048 m | 16,551 ft |
2. | FW | Fred Willerup | 81 | 3,881 m | 12,725 ft |
3. | WW | Will Wray | 72 | 3,638 m | 11,930 ft |
4. | MS | Mark Syrett | 54 | 2,791 m | 9,151 ft |
5. | DR | Dave Randell | 35 | 2,177 m | 7,138 ft |
6. | SL | Simon Love | 33 | 2,041 m | 6,693 ft |
7. | DG | Dave Gee | 45 | 1,944 m | 6,376 ft |
8. | RL | Ruth Love | 40 | 1,878 m | 6,157 ft |
9. | PS | Paul Smith | 40 | 1,731 m | 5,676 ft |
10. | PM | Peter McLain | 5 | 732 m | 2,400 ft |
11. | SF | Sean Franks | 10 | 638 m | 2,093 ft |
12. | BOC | Brid O'Conaill | 14 | 612 m | 2,007 ft |
13. | SR | Susi Ross | 19 | 593 m | 1,945 ft |
14. | SL2 | Steve Loughran | 16 | 523 m | 1,717 ft |
15. | NC | Nick Cassin | 8 | 412 m | 1,351 ft |
16. | LS | Liz Stanley | 11 | 410 m | 1,347 ft |
17. | DG2 | Duncan Gough | 9 | 365 m | 1,197 ft |
18. | MW | Mathias Willerup | 11 | 344 m | 1,130 ft |
19. | DJ | Duane Jacobson | 3 | 335 m | 1,100 ft |
20. | SD | Sam Dickinson | 1 | 300 m | 983 ft |
21. | CK | Caroline Knight | 4 | 228 m | 750 ft |
22. | ES | Ed Stone | 2 | 187 m | 615 ft |
23. | MP | Mike Powell | 5 | 164 m | 540 ft |
24. | SG2 | Sam Gosling | 2 | 158 m | 520 ft |
25. | BS | Bina Shah | 2 | 70 m | 230 ft |
26. | AH | Adrian Horrell | 2 | 48 m | 160 ft |
27. | HB | Howie Bailey | 2 | 48 m | 159 ft |
28. | SG | Sarah Gee | 1 | 36 m | 120 ft |
29. | CS | Chris Sly | 1 | 11 m | 36 ft |
30. | MN | Matt Noddings | 1 | 9 m | 29 ft |
All information on this site is copyright © 1994-2016 Jim Randell